---
Project: TraceabilitySystem
State: Pending
Priority: P0-Critical
Description:
---
> [!info] 🏛️ TSO-ADR-001_Project_Folder_structure
> **Date of Decision:**  2026-06-04 
> 
> ---
> *Connections*
> - **Related REQs:** |  |
> - **Related ADRs:** |  |
> ---
>  ## **1. The Context (Systemic Problem)**
>  ***Issue***
>  [Describe the high-level, platform-wide bottleneck, infrastructure need, or operational friction that requires a global structural pivot.]
>
>  ***Propose Design***
>  
>   ##  **2. The Decision**
> [State the exact system-wide rule, technology, or framework methodology being mandated across the entire ecosystem.]
> 
>  ## **3. The Consequences (Architectural Impact)**
> ***Impact***
> [e.g., Requires modifcation accros REQ-002 and REQ-003. Also the state flow of ADR-010 should be modify]
> ***Positive Effects***
> [e.g., Eliminates artifact fragmentation across the SDLC.]
> ***Constraints***
> [e.g., Requires strict exclusion from local cloud sync engines.]

