{
  "name": "risk-register",
  "version": "0.1.2",
  "description": "Build or update an enterprise or project risk register — each risk written as cause, event and consequence, scored for likelihood and impact on a defined scale, inherent and residual ratings, a named owner, a treatment (avoid, reduce, transfer, accept), controls, a due date and a review trigger — with a heat map, the top risks that need a decision, and a stdlib script that validates the register CSV and flags overdue reviews. Use when the user wants a risk register, a risk log, a RAID log's risk section, a heat map, or says \"what are our top risks\", \"update the risk register\", \"score these risks\".",
  "entrypoint": "SKILL.md",
  "deps": {
    "npm": [],
    "pip": []
  },
  "env": {
    "required": [],
    "optional": []
  },
  "related": [
    "agent-threat-model",
    "decision-log",
    "dpia",
    "nfr-spec",
    "soc2-evidence-map",
    "threat-model"
  ],
  "handoff": [
    {
      "to": "decision-log",
      "when": "the committee has decided on the top risks",
      "purpose": "Record each accept, fund or avoid decision with who made it and why.",
      "fallback": "If decision-log is absent, add the decision, the decider and the date to the risk's controls cell and the summary."
    }
  ],
  "tags": [
    "risk",
    "risk-register",
    "grc",
    "heat-map",
    "governance",
    "compliance"
  ],
  "permissions": {"network": [], "commands": [], "files": "named-paths"},
  "model": {
    "tier": "standard",
    "rationale": "Structured writing against a fixed format and scale, with a script doing the checks and counts. Scoring needs some judgment but is bounded by the written scale."
  }
}
