{
  "app.Preparing improvement decisions": "正在准备改修决策",
  "app.Adjust text size, manage data, switch interfaces, and reopen Help.": "调整字体、管理数据、切换新旧界面，并随时重新打开帮助。",
  "app.Browse equipment and add plans": "浏览装备并加入计划",
  "app.Close": "关闭",
  "app.Data": "数据",
  "app.Drag to resize": "拖动调整宽度",
  "app.Equipment": "装备",
  "app.Equipment blacklist": "低优先装备",
  "app.Equipment library": "装备库",
  "app.Help": "帮助",
  "app.runtime_data_updating": "正在检查改修数据更新…",
  "app.Improvement Plan": "改修计划",
  "app.Improvement assistant": "改修助手",
  "app.Left candidate list": "左侧候选列表",
  "app.Main tabs": "主要 Tab",
  "app.Manage long-term goals": "管理中长期改修目标",
  "app.New interface at a glance": "新版界面概览",
  "app.New interface layout preview": "新版界面布局预览",
  "app.Pick today's action": "决定今天先改什么",
  "app.Plan management": "计划管理",
  "app.Release Notes": "更新日志",
  "app.Review assistant ships, materials, upgrade chains, shortages, and the selected plan in one place.": "集中查看秘书舰、材料、改修链、普通／确保缺口以及当前计划。",
  "app.Right detail area": "右侧详情区",
  "app.Save reusable material routes": "保存可复用的升级材料路线",
  "app.Screen layout": "界面分区",
  "app.Search and sort area": "搜索与排序区",
  "app.Search equipment, combine category filters, and change the order used for today’s candidates.": "搜索装备、组合分类筛选，并调整“今天改什么”的候选顺序。",
  "app.The left side is used to find and select equipment. The right side keeps the complete details for the current selection.": "左侧负责搜索、排序和选择装备，右侧集中显示当前装备的完整详情。",
  "app.The list keeps the recommended order clear. Select an equipment item to inspect it.": "列表按推荐顺序展示候选；点选装备后在右侧查看详情。",
  "app.The new interface separates daily decisions, long-term plans, equipment browsing, and reusable upgrade-route choices.": "新版将每天的改修决策、长期计划、装备查找和全局升级路线分别放在清晰的入口中。",
  "app.This guide opens automatically only once. You can reopen it from Help at any time.": "这份新版说明只会自动弹出一次，之后可随时从“帮助”重新打开。",
  "app.Top toolbar": "顶部功能栏",
  "app.What to improve today": "今天改什么",
  "app.compact font": "紧凑字体",
  "app.large font": "放大字体",
  "app.standard font": "标准字体",
  "beginner.Active stage": "当前阶段",
  "beginner.Add recommended plan": "加入建议计划",
  "beginner.Add top five unplanned goals": "加入前5个未规划目标",
  "beginner.All categories": "全部分类",
  "beginner.Already planned": "已有计划",
  "beginner.As many as useful": "多多益善",
  "beginner.Auto stage": "自动判断",
  "beginner.Beginner recommendations": "新人推荐",
  "beginner.Blank source rating normalized to one star": "原文空白已按一星计入",
  "beginner.Core fleet phase": "常规图成型",
  "beginner.Current progress": "当前进度",
  "beginner.Data section": "数据分区",
  "beginner.Detected current stage": "当前阶段判断",
  "beginner.Equipment category": "装备分类",
  "beginner.Equipment strength": "装备强度",
  "beginner.Estimated screw cost penalty": "预计螺丝成本扣分",
  "beginner.Estimated screws from zero": "从零预计螺丝",
  "beginner.Event preparation phase": "活动准备",
  "beginner.Event strength": "活动图强度",
  "beginner.Goal complete": "目标已完成",
  "beginner.Guide notes": "攻略说明",
  "beginner.Hide calculation": "收起计算",
  "beginner.Hide details": "收起详情",
  "beginner.Inventory progress": "库存进度",
  "beginner.Late-game optimization phase": "后期优化",
  "beginner.No guide summary": "暂无简要说明",
  "beginner.No recommendations match the current filters": "没有符合当前条件的推荐",
  "beginner.Normal map strength": "常规图强度",
  "beginner.Not inferred": "不判断",
  "beginner.Only show unfinished goals": "只显示未完成目标",
  "beginner.Optional goal": "可选目标",
  "beginner.Optional goal adjustment": "可选目标调整",
  "beginner.Plan recommendation entries": "计划推荐条目",
  "beginner.Plan-eligible star targets": "可生成计划的星级目标",
  "beginner.Plans created": "生成计划",
  "beginner.Priority": "优先级",
  "beginner.Raw score": "原始分",
  "beginner.Read-only recommendation": "仅供阅览",
  "beginner.Recommendation grade": "推荐等级",
  "beginner.Recommendation stage": "推荐阶段",
  "beginner.Recommended goal": "建议目标",
  "beginner.Recommended quantity": "建议数量",
  "beginner.Recommended route": "建议路线",
  "beginner.Score breakdown": "评分构成",
  "beginner.Scoring source": "评分来源",
  "beginner.Source priority": "攻略优先级",
  "beginner.Stage fit": "阶段适配",
  "beginner.Staged plan recommendations": "分阶段计划推荐",
  "beginner.Star target not specified": "原文未指定星级",
  "beginner.Starter phase": "起步阶段",
  "beginner.Task completion": "任务完成情况",
  "beginner.Task data is for reading only": "任务数据仅供阅览",
  "beginner.Task reference": "任务参考",
  "beginner.Task reference entries": "任务参考条目",
  "beginner.Task reference only": "任务参考（只读）",
  "beginner.Task route": "任务路线",
  "beginner.Task routes are read-only and never participate in staged plans because task completion cannot be determined reliably": "任务路线只供阅览；由于无法可靠判断任务是否完成，它们不会参与分阶段计划",
  "beginner.The plugin does not guess whether a task was completed and does not create or score plans from task routes": "插件不会猜测任务是否完成，也不会根据任务路线创建计划或参与评分",
  "beginner.The source does not specify a target star level, so the plugin will not invent a plan target": "原文没有指定目标星级，插件不会擅自生成计划目标",
  "beginner.The source priority and strength ratings are author opinions; inventory, progress, availability, and screw cost are calculated by the plugin": "攻略中的优先级和强度属于作者观点；库存、完成进度、可改日期和螺丝成本由插件计算。",
  "beginner.This recommendation has multiple covered starting routes; choose a route in the screw-saving assistant before creating a plan": "该推荐存在多个已覆盖的起始路线，请先在省螺丝助手中选择路线后再创建计划",
  "beginner.Today available bonus": "今天可改加分",
  "beginner.Turn guide ratings into staged goals based on your current inventory": "结合当前库存，把攻略评分转成分阶段目标",
  "beginner.Update plan": "更新计划",
  "beginner.Usually skip": "通常不做",
  "beginner.View calculation": "查看计算",
  "beginner.View details": "查看详情",
  "beginner.Visible recommendations": "当前推荐数",
  "beginner.Visible references": "当前参考条目",
  "blacklist.Add": "加入",
  "blacklist.Add selected to blacklist": "将选中项设为低优先",
  "blacklist.Added order": "加入顺序",
  "blacklist.Blacklist is empty": "暂无低优先装备",
  "blacklist.Cancel": "取消",
  "blacklist.Choose equipment": "选择装备",
  "blacklist.Close": "关闭",
  "blacklist.Equipment blacklist": "低优先装备",
  "blacklist.Equipment name": "装备名称",
  "blacklist.Equipment rarity": "稀有度",
  "blacklist.Rarity stars %d": "%d颗星",
  "blacklist.Rarity unknown": "稀有度未知",
  "blacklist.Equipment type": "装备类型",
  "blacklist.Manual exclusion": "手动设为低优先",
  "blacklist.No recommended exclusions": "当前没有推荐低优先装备",
  "blacklist.Reason initial and recurring quest": "低优先理由：升级产物「%s」是「%s」的初期装备，且有周期任务来源",
  "blacklist.Reason initial equipment": "低优先理由：升级产物「%s」是「%s」的初期装备",
  "blacklist.Reason recurring quest": "低优先理由：升级产物「%s」有周期任务来源",
  "blacklist.Reason remodel and recurring quest": "低优先理由：升级产物「%s」可由「%s」Lv.%d 改造获得，且有周期任务来源",
  "blacklist.Reason remodel equipment": "低优先理由：升级产物「%s」是「%s」Lv.%d 改造后的装备",
  "blacklist.Recommendations count %d": "推荐 %d 件",
  "blacklist.Preparing recommendations": "正在生成低优先推荐",
  "blacklist.Recommended exclusions": "推荐低优先装备",
  "blacklist.Recommended exclusions count %d": "推荐低优先装备 %d 件",
  "blacklist.Recommended priority": "推荐优先级",
  "blacklist.Remove selected": "移出选中项",
  "blacklist.Selected count %d": "已选择 %d 件",
  "blacklist.Sort by": "排序方式",
  "blacklist.View recommendations": "查看推荐",
  "chain.0 to MAX improvement materials": "★0～★MAX 改修材料",
  "chain.Ammo": "弹药",
  "chain.Ammo short": "弹",
  "chain.Assistant ship": "秘书舰",
  "chain.Base resources": "基础资源（燃 / 弹 / 钢 / 铝）",
  "chain.Bauxite": "铝土",
  "chain.Bauxite short": "铝",
  "chain.Chain equipment": "链路装备",
  "chain.Chain stage %d": "链路第 %d 段",
  "chain.Chain start": "链路起点",
  "chain.Close": "关闭",
  "chain.Complete improvement chain": "完整改修升级链",
  "chain.Consumable items": "消耗道具",
  "chain.Conversion result": "转换产物",
  "chain.Current position": "当前位置",
  "chain.Currently selected equipment": "当前装备",
  "chain.Development materials": "开发资材",
  "chain.Development short": "开发",
  "chain.Drag the canvas with the mouse or trackpad; each node moves as one complete card": "使用鼠标或触摸板拖动画布；每个节点都作为完整卡片整体移动",
  "chain.Drag the lower-right corner to resize the window": "拖动右下角可调整窗口大小",
  "chain.Each equipment node separates 0-to-MAX improvement materials from MAX conversion materials": "每个装备节点分别展示 ★0～★MAX 的改修材料与 ★MAX → 进化装备的材料。",
  "chain.Equipment materials": "装备素材",
  "chain.Fit window": "适配窗口",
  "chain.Flat route view": "路线平铺",
  "chain.Focus current": "定位当前",
  "chain.Fuel": "燃料",
  "chain.Fuel short": "燃",
  "chain.Improvement stage %d": "改修阶段 %d",
  "chain.MAX conversion": "MAX 转换",
  "chain.MAX conversion materials": "★MAX → 进化材料",
  "chain.Material route %d": "材料路线 %d",
  "chain.Materials used": "会消耗的材料",
  "chain.Matrix view": "表格对比",
  "chain.Maximize": "最大化",
  "chain.Merged equivalent schedules %d": "已合并 %d 组等价日程",
  "chain.Next stages": "后续分支",
  "chain.No 0 to MAX improvement data in the current dataset": "当前数据中没有 ★0～★MAX 改修材料",
  "chain.No extra material equipment": "不需要额外材料装备",
  "chain.No further improvement route in the current dataset": "当前数据中没有后续改修路线",
  "chain.No known upgrade chain": "没有已知升级链",
  "chain.No material cost": "无额外材料消耗",
  "chain.Open the complete chain to pan, zoom, and compare route materials": "打开完整升级链后可拖动、缩放并比较各路线材料。",
  "chain.Previous stages": "前置分支",
  "chain.Reset zoom": "重置缩放",
  "chain.Restore window": "还原窗口",
  "chain.Route": "路线",
  "chain.Route %d": "路线 %d",
  "chain.Routes %d": "%d 条路线",
  "chain.Screws": "螺丝",
  "chain.Screws short": "螺丝",
  "chain.Selected route": "当前选择",
  "chain.Steel": "钢材",
  "chain.Steel short": "钢",
  "chain.Zoom in": "放大",
  "chain.Zoom out": "缩小",
  "data.Automatic": "自动",
  "data.Automatic uses live data when logged in and persistent profile when Poi has no account session": "自动模式在已登录时使用实时数据，在 Poi 没有账号会话时使用持久化资料。",
  "data.Choose JSON file": "选择 JSON 文件",
  "data.Close": "关闭",
  "data.Current Poi data": "当前 Poi 数据",
  "data.Data backup and transfer": "数据备份与导入",
  "data.Delete persistent profile": "删除持久化资料",
  "data.Export backup": "导出备份",
  "data.Export data": "导出数据",
  "data.Export personal profile JSON": "导出个人资料 JSON",
  "data.Export plans, route choices, and interface settings as a JSON backup": "把改修计划、材料路线选择和界面设置导出为 JSON 备份。",
  "data.General uses real inventory; all-ship mode changes assistants only; rich inventory temporarily simulates half the relevant ships and most improvable equipment": "普通模式使用真实库存；全舰娘模式只改变秘书舰；富库存模式会临时模拟半数相关舰娘和大部分可改修装备",
  "data.Import data": "导入数据",
  "data.Import personal profile JSON": "导入个人资料 JSON",
  "data.Load all-ship test data": "载入全舰娘测试数据",
  "data.Load general-fleet test data": "载入一般舰队测试数据",
  "data.Merge import": "合并导入",
  "data.Merge keeps unrelated current plans, while replace restores exactly what is in the backup": "合并导入会保留当前其他计划；覆盖导入会完全恢复为备份中的内容。",
  "data.No persistent personal profile exists": "没有已持久化的个人资料。",
  "data.Persistent profile": "持久化资料",
  "data.Persistent profile %s ships %e equipment": "已保存资料：%s 艘舰船，%e 件装备",
  "data.Persistent profile not saved": "尚未保存个人资料",
  "data.Personal profile data source": "个人资料数据源",
  "data.Personal profile data source changed; Poi will reload": "个人资料数据源已切换，Poi 将重新载入。",
  "data.Personal profile deleted; Poi will reload": "个人资料已删除，Poi 将重新载入。",
  "data.Personal profile exported": "个人资料已导出。",
  "data.Personal profile imported; Poi will reload": "个人资料已导入，Poi 将重新载入。",
  "data.Personal profile persistence": "个人资料持久化",
  "data.Personal profile saved in Poi data": "个人资料已保存到 Poi 数据目录。",
  "data.Replace current data": "覆盖当前数据",
  "data.Save current Poi profile": "保存当前 Poi 资料",
  "data.Save ships, equipment, resources, and master data in Poi APPDATA; choose automatic, live Poi data, or persistent profile explicitly": "把舰船、装备、资源和主数据保存到 Poi APPDATA；可以明确选择自动、当前 Poi 数据或持久化资料。",
  "data.Save ships, equipment, resources, and master data in Poi APPDATA; when live account data is empty, the plugin automatically uses this local profile": "把舰船、装备、资源和主数据保存到 Poi APPDATA；实时账号数据为空时，插件会自动使用这份本地资料。",
  "data.The backup does not contain improvement plans": "数据文件中没有改修计划数据。",
  "data.The current Poi state has no ships or equipment to save": "当前 Poi 状态没有可保存的舰船或装备。",
  "data.The persistent personal profile could not be read": "无法读取持久化个人资料。",
  "data.The personal profile could not be deleted": "无法删除个人资料。",
  "data.The personal profile could not be exported": "无法导出个人资料。",
  "data.The personal profile could not be imported": "无法导入个人资料。",
  "data.The personal profile could not be saved": "无法保存个人资料。",
  "data.The data file could not be exported": "无法导出数据文件。",
  "data.The selected file could not be imported": "无法导入所选文件。",
  "data.The selected file could not be read": "无法读取所选文件。",
  "data.The selected file does not contain a supported personal profile": "所选文件不包含受支持的个人资料。",
  "data.The selected file does not contain valid backup data": "所选文件不包含有效的数据。",
  "data.The selected file is not valid JSON": "所选文件不是有效的数据文件。",
  "data.This backup belongs to another plugin": "此备份属于其他插件。",
  "data.This backup format is not supported by this version": "当前版本不支持此备份格式。",
  "data.This personal profile format is not supported by this version": "当前版本不支持这份个人资料格式。",
  "decisions.Advantage": "优势",
  "decisions.After disabling, intermediate equipment plans may be edited separately and inconsistent plans may waste screws, development materials, or material equipment": "关闭后可以单独修改中间装备计划；计划不一致可能浪费螺丝、开发资材或素材装备。",
  "decisions.Any equipment plan may be edited independently": "任意装备计划都可以独立修改。",
  "decisions.Business direction applied": "已应用默认升级方向",
  "decisions.Choose a preferred material route": "选择偏好的材料路线",
  "decisions.Choose before existing plans are converted": "请在处理现有计划前选择",
  "decisions.Choose how to make %s": "选择如何获得 %s",
  "decisions.Choose this route": "选择这条路线",
  "decisions.Compare every material before choosing; the window can be resized from its lower-right corner": "选择前请逐项对比材料；可从窗口右下角调整大小",
  "decisions.Compare route materials": "路线材料对照",
  "decisions.Complete upgrade chain": "完整升级链",
  "decisions.Confirm disabling": "确认关闭保护",
  "decisions.Confirm disabling (%d)": "确认关闭（%d）",
  "decisions.Consumable material": "普通材料",
  "decisions.Continue disabling": "继续关闭",
  "decisions.Cross-equipment plans must choose their complete route first": "跨装备升级计划必须先确定完整改造路线。",
  "decisions.Cross-equipment plans must keep a confirmed route, and route choices are enforced when required": "跨装备计划必须保留已确认路线，需要选择路线时会强制完成。",
  "decisions.Cycle detected · display only": "检测到环形链路 · 仅展示",
  "decisions.Development guaranteed": "开发资材（确保）",
  "decisions.Development materials normal / guaranteed": "开发资材 普通 / 确实化",
  "decisions.Development normal": "开发资材（普通）",
  "decisions.Different production routes, same target equipment": "不同前置路线，最终得到同一件装备",
  "decisions.Disadvantage": "劣势",
  "decisions.Display only": "仅展示",
  "decisions.Equipment name": "装备名称",
  "decisions.Green marks the lower material cost; only a fully dominant route is highlighted": "仅将消耗更低的项目标绿，只有全维度领先的路线才整体突出显示",
  "decisions.Important": "重要",
  "decisions.Insufficient data for absolute comparison": "数据不足，无法进行绝对比较",
  "decisions.Keep this route": "保持这条路线",
  "decisions.Material equipment": "素材装备",
  "decisions.Neutral": "中立",
  "decisions.No matching upgrade route choices": "没有符合条件的升级路线",
  "decisions.Optional": "可选",
  "decisions.Optional family": "可选装备族",
  "decisions.Optional preference": "可选偏好",
  "decisions.Optional unselected route preferences %d": "尚未选择的可选路线偏好 %d",
  "decisions.Planning follows the preferred equipment direction; reverse conversions remain visible as reference and do not create duplicate route choices.": "规划默认沿优先装备形态前进；反向转换仍作为参考展示，但不会重复生成路线选择。",
  "decisions.Plans may be edited independently, including intermediate equipment in an upgrade chain": "所有装备计划都可以独立修改，包括改造链中的中间装备。",
  "decisions.Please confirm again": "请再次确认",
  "decisions.Read left to right; branches stay inside the same equipment family": "从左向右阅读；所有分支都保留在同一装备族内",
  "decisions.Recommended": "推荐",
  "decisions.Required": "必须选择",
  "decisions.Required by current plans": "当前计划必选",
  "decisions.Required route choices are enforced before cross-equipment planning continues": "跨装备计划继续前，必须先完成相关路线选择。",
  "decisions.Result equipment": "结果装备",
  "decisions.Result star": "最终星级",
  "decisions.Return": "返回",
  "decisions.Reverse conversion": "反向转换",
  "decisions.Review complete equipment families, then choose only the material branches that matter to your plans": "先查看完整装备族链路，再只选择当前计划真正涉及的材料分支",
  "decisions.Route choice view": "路线选择视图",
  "decisions.Route selected": "已选路线",
  "decisions.Route type": "路线类型",
  "decisions.Same": "相同",
  "decisions.Same improvement stage, different materials": "同一改修阶段，但秘书舰路线会吃掉不同材料",
  "decisions.Screws guaranteed": "改修资材（确保）",
  "decisions.Screws normal": "改修资材（普通）",
  "decisions.Screws normal / guaranteed": "螺丝 普通 / 确实化",
  "decisions.Search active": "搜索已启用",
  "decisions.Search and sort": "搜索与排序",
  "decisions.Search target or source equipment": "搜索目标装备或来源装备",
  "decisions.Selected route": "当前选择",
  "decisions.Sort by": "排序方式",
  "decisions.Source equipment": "来源装备",
  "decisions.System cannot compare different equipment routes": "不同装备路线，系统无法比较",
  "decisions.System cannot decide between these routes": "路线各有取舍，系统无法抉择",
  "decisions.System-recognized better route": "系统可判断为更优",
  "decisions.System-recognized worse route": "系统可判断为较差",
  "decisions.Table view": "表格视图",
  "decisions.The plugin will no longer block plan edits that can conflict with intermediate equipment in an upgrade chain": "插件将不再阻止与改造链中间装备冲突的计划修改。",
  "decisions.The plugin will not block route conflicts that may cause improvement-material waste": "插件不会阻止可能导致改修材料浪费的路线冲突。",
  "decisions.This chain still contains an unresolved cycle after business direction rules, so it remains display only.": "应用业务方向规则后仍存在无法消除的环，因此当前仅完整展示。",
  "decisions.This route goes against the preferred planning direction and is used only when you explicitly want this target": "这条路线与默认规划方向相反，仅在你明确需要该目标装备时使用",
  "decisions.Tile view": "平铺视图",
  "decisions.Unknown": "不明",
  "decisions.Unresolved route choices %d": "还有 %d 个计划需要选择材料路线",
  "decisions.Unselected first": "未选择优先",
  "decisions.Upgrade chain overview": "升级链路总览",
  "decisions.Use table view for direct material comparison or tile view for route summaries": "表格视图适合逐项对比材料，平铺视图适合快速浏览路线摘要",
  "decisions.You must choose a material route": "请先选择要走的材料路线",
  "decisions.upgrade": "升级",
  "equipment.%d days per week": "每周 %d 天",
  "equipment.%d improvement actions": "约 %d 次改修",
  "equipment.%d screws": "%d 螺丝",
  "equipment.ASW equipment": "反潜装备",
  "equipment.Acquisition route stages": "获得路线阶段",
  "equipment.Active conditions %d": "已启用 %d 个条件",
  "equipment.Assistant ship": "秘书舰",
  "equipment.All assistant ships": "秘书舰可改日期",
  "equipment.All categories": "全部分类",
  "equipment.All equipment": "全部装备",
  "equipment.All statuses": "全部状态",
  "equipment.Ammo": "弹药",
  "equipment.Anti-air equipment": "防空装备",
  "equipment.Apply %d": "应用 %d",
  "equipment.Bauxite": "铝土",
  "equipment.Cancel": "取消",
  "equipment.Carrier aircraft": "舰载机",
  "equipment.Categories are grouped by combat role; multi-select uses OR": "分类按战斗用途分组；多选分类之间使用“或”逻辑",
  "equipment.Choose a route in the equipment page": "请先在装备界面选择路线",
  "equipment.Choose plan copy": "选择计划项",
  "equipment.Choose route": "选择路线",
  "equipment.Plan management": "计划管理",
  "equipment.Consumable plan": "耗材计划",
  "equipment.Materials insufficient": "材料不足",
  "equipment.Acquire first": "先获取",
  "equipment.Clear": "清空",
  "equipment.Clear filters": "清除筛选",
  "equipment.Completed": "已完成",
  "equipment.Current stage": "当前阶段",
  "equipment.Development materials normal / guaranteed": "开发资材 普通 / 确实化",
  "equipment.Engines and armor": "机关与装甲",
  "equipment.Equipment category": "装备分类",
  "equipment.Equipment filters and sort": "装备筛选与排序",
  "equipment.Equipment name": "装备名称",
  "equipment.Equipment rarity": "装备稀有度",
  "equipment.Equipment scope": "装备范围",
  "equipment.Equipment type": "装备分类",
  "equipment.Evolution chain": "进化链路",
  "equipment.Evolvable": "可进化",
  "equipment.Final improvement target": "最终改修目标",
  "equipment.Fri": "五",
  "equipment.Fuel": "燃料",
  "equipment.Guns and shells": "火炮与炮弹",
  "equipment.Improvable": "可改修",
  "equipment.Improvement capability": "改修能力",
  "equipment.Improvement day": "改造日",
  "equipment.In progress": "进行中",
  "equipment.It can only be used as an improvement target": "仅可作为改修目标",
  "equipment.Landing and ground equipment": "登陆与对地装备",
  "equipment.Mon": "一",
  "equipment.No equipment categories are available": "没有可用的装备分类",
  "equipment.No improvement route": "没有改修路线",
  "equipment.No matching equipment": "没有符合条件的装备",
  "equipment.None": "无",
  "equipment.No plan": "无计划",
  "equipment.Not improvable": "不可改修",
  "equipment.Only one route; no choice is required": "只有一条路线，无需选择",
  "equipment.Other equipment": "其他装备",
  "equipment.Owned assistant ships": "秘书舰可改日期",
  "equipment.Owned": "持有",
  "equipment.Owned count %d": "持有 %d",
  "equipment.Owned equipment": "个人拥有",
  "equipment.Plan %d of %d": "计划 %d / %d",
  "equipment.Plan complete": "计划已完成",
  "equipment.Plan route choice": "计划路线选择",
  "equipment.Plan status": "计划状态",
  "equipment.Planned equipment first": "计划装备优先",
  "equipment.Planned first": "有计划优先",
  "equipment.Primary sort": "第一排序",
  "equipment.Radar and electronics": "电探与电子装备",
  "equipment.Remaining %d": "还差 %d",
  "equipment.Route %d": "路线 %d",
  "equipment.Route choice": "线路选择",
  "equipment.Route selected": "已选路线",
  "equipment.Sat": "六",
  "equipment.Screws normal / guaranteed": "螺丝 普通 / 确实化",
  "equipment.Seaplanes and rotorcraft": "水上机与旋翼机",
  "equipment.Search equipment, assistant ship, or upgrade target": "搜索装备、秘书舰或更新目标",
  "equipment.Secondary sort": "第二排序",
  "equipment.Select an improvement route to view its stages": "请选择一条改修路线以查看改修阶段",
  "equipment.Selected %d": "已选 %d",
  "equipment.Selected %d of %s": "已选 %d / %s",
  "equipment.Set a target quantity to calculate acquisition costs": "设置目标数量后计算获得路线消耗",
  "equipment.Sort by": "排序方式",
  "equipment.Source equipment missing": "缺少前置装备",
  "equipment.Steel": "钢材",
  "equipment.Sun": "日",
  "equipment.Support and special equipment": "支援与特殊装备",
  "equipment.Target": "目标",
  "equipment.Target equipment improvement stages": "目标装备改修阶段",
  "equipment.Target only": "仅作为目标",
  "equipment.The saved route no longer matches the current improvement data": "已保存的路线无法匹配当前改修数据",
  "equipment.The selected route is missing required source data": "所选路线缺少必要的来源数据",
  "equipment.This equipment cannot be improved": "此装备不可改修",
  "equipment.This route has no improvement stages": "这条路线没有改修阶段",
  "equipment.Thu": "四",
  "equipment.Today": "今天",
  "equipment.Torpedoes and special submarines": "鱼雷与特殊潜航装备",
  "equipment.Total consumption and gaps": "总消耗与缺口",
  "equipment.Tue": "二",
  "equipment.Upgrade stage": "更新阶段",
  "equipment.Upgrade to": "更新为",
  "equipment.Wed": "三",
  "legacy.%d equipment": "%d 件装备",
  "legacy.2nd Ship": "秘书舰",
  "legacy.Ability filters use OR; other filter groups use AND": "能力条件之间取“或”，不同筛选组之间取“且”",
  "legacy.Active filters": "当前筛选",
  "legacy.Add": "添加",
  "legacy.Add a star goal in the equipment library to calculate material-saving paths": "请先在装备库设置具体星级目标，系统才能计算省材料方案",
  "legacy.Affordable with current screws": "当前螺丝可以负担",
  "legacy.All": "全部装备",
  "legacy.All plans": "全部计划",
  "legacy.Apply %d categories": "应用 %d 个分类",
  "legacy.Assistant ship today": "今天的秘书舰",
  "legacy.Availability basis": "日期口径",
  "legacy.Available": " (可用: %d)",
  "legacy.Available %d days per week": "理论每周可改 %d 天",
  "legacy.Available again in %d days": "%d 天后可改",
  "legacy.Available to improve today": "今天可以改",
  "legacy.Available today first": "今天可改优先",
  "legacy.Base equipment total": "本体装备总需求",
  "legacy.Calculated from your owned ships": "按秘书舰日程计算",
  "legacy.Can become": "可继续更新为",
  "legacy.Can come from": "可由这些装备获得",
  "legacy.Choose one first so recommendations and cost estimates use the route you really intend to follow": "请先选定一条路线，之后的推荐和消耗估算都会按你的选择计算。",
  "legacy.Choose one mutually exclusive plan status": "计划状态为互斥单选",
  "legacy.Choose only when different routes consume different materials for the same result": "只在相同结果会消耗不同材料时要求选择",
  "legacy.Choose screw-saving route": "选择省螺丝路线",
  "legacy.Choose weekday": "选择日期",
  "legacy.Chosen material route": "已选材料路线",
  "legacy.Clear category filter": "清除分类筛选",
  "legacy.Collapse All": "全部折叠",
  "legacy.Collapse details": "收起详情",
  "legacy.Compare normal expected cost with guaranteed fixed cost before spending screws or equipment": "在消耗螺丝和装备前，对比普通改修的期望成本与确保成功的固定成本",
  "legacy.Compare the main candidate improvement and conversion routes from your current inventory to each plan goal": "从当前库存出发，比较通向各计划目标的主要改修与更新候选路线",
  "legacy.Content": "内容",
  "legacy.Convertible maximum": "全部兑换后上限",
  "legacy.Convertible reserves are an upper limit, not a recommendation": "可兑换资源只表示理论上限，不代表建议全部消耗",
  "legacy.Costs involve trade-offs": "成本互有取舍，无法判定绝对优劣",
  "legacy.Current": "当前装备",
  "legacy.Current equipment": "当前装备",
  "legacy.Current focus": "当前焦点",
  "legacy.Current screws": "当前螺丝",
  "legacy.Current-stage expected and guaranteed cost": "当前阶段期望消耗与确保消耗",
  "legacy.Customize": "自定义",
  "legacy.Customize detail panel": "自定义详情面板",
  "legacy.Decision chains": "决策链",
  "legacy.Decision date": "决策日期",
  "legacy.Default": "默认",
  "legacy.Detail panel settings": "详情面板设置",
  "legacy.Details": "详情",
  "legacy.Dev guaranteed short": "开确",
  "legacy.Dev normal short": "开普",
  "legacy.Different result or conditions": "结果或条件不同，请自行选择",
  "legacy.Different result or starting equipment": "产物或起始装备不同，请自行选择",
  "legacy.Drag only empty canvas space or use the scrollbars to move; material content expands each node": "仅拖动画布空白处或使用滚动条浏览；材料内容会撑开所属节点",
  "legacy.Drag the canvas from the current equipment stage; each node groups routes with the same equipment and star level": "从当前装备阶段开始拖动画布；相同装备与相同星级的路线合并到同一节点",
  "legacy.Drag the empty canvas or use the scrollbars to move; material tables scroll independently": "拖动空白画布或使用滚动条浏览链路；材料表格保持独立滚动",
  "legacy.Drag the empty canvas to move; use the wheel to zoom; all node materials remain visible and scroll independently": "拖动画布空白处移动；滚轮缩放；所有节点材料保持显示，节点内容可独立滚动",
  "legacy.Drag the empty canvas to move; use the wheel to zoom; node contents scroll independently": "拖动画布空白处移动；滚轮缩放；节点内容独立滚动",
  "legacy.Each remaining item is estimated with this same route; shared inventory is not optimized across plans": "假定剩余每件都走同一路线；尚未跨计划优化共享库存",
  "legacy.Equipment Improvement": "装备改修2",
  "legacy.Equipment abilities": "装备能力",
  "legacy.Equipment categories %d": "装备分类 %d",
  "legacy.Equipment consumed": "消耗装备",
  "legacy.Equipment stage": "装备阶段",
  "legacy.Estimated screws normal / guaranteed": "预计螺丝 普通 / 确实化",
  "legacy.Estimated success rate": "预计成功率",
  "legacy.Estimated success rate %s": "预计成功率 %s",
  "legacy.Exceeds convertible screw limit": "超过可兑换螺丝上限",
  "legacy.Expand All": "全部展开",
  "legacy.Expand details": "展开详情",
  "legacy.Expand only non-empty categories": "仅展开内容非空的装备类别",
  "legacy.Expected attempts": "预计尝试次数",
  "legacy.Export as Image": "导出图片",
  "legacy.Filter by in-game equipment category": "按游戏内装备分类筛选",
  "legacy.Fleet data not loaded": "舰队数据尚未载入",
  "legacy.Friday": "星期五",
  "legacy.General fleet uses your real ships; all-ship mode temporarily treats every assistant ship as owned": "一般舰队使用你实际拥有的舰娘；全舰娘模式会暂时视为拥有全部秘书舰",
  "legacy.Goal %s x%d": "目标 %s ×%d",
  "legacy.Green is better, red is worse, and yellow means the system cannot decide": "绿色表示更优，红色表示较差，黄色表示系统无法抉择",
  "legacy.Guaranteed success fixed cost": "确保成功固定成本",
  "legacy.Guaranteed success fixed total": "确保成功固定总量",
  "legacy.Guaranteed success is no more expensive in every comparable cost": "确保成功在所有可比较消耗上都不更贵，建议确保",
  "legacy.Has upgrade destination": "存在更新目标",
  "legacy.If skipped today": "今天错过后",
  "legacy.Improvement Query": "改修查询",
  "legacy.Improvement actions": "改修次数",
  "legacy.Improvement budget": "改修预算",
  "legacy.Improvement information": "改修信息",
  "legacy.Improvement route": "改修路线",
  "legacy.Infinity": "不设上限",
  "legacy.Intermediate equipment plans are managed by the chain instead of being edited independently": "路线中的中间装备计划由改造链统一管理，不能独立修改。",
  "legacy.Intermediate star levels are collapsed": "中间星级已折叠",
  "legacy.Invalid": "无效",
  "legacy.Main screw-saving routes for your plans": "计划的主要省螺丝路线",
  "legacy.Matched improvable goals": "可匹配改修目标",
  "legacy.Material choices that need confirmation": "需要确认的材料选择",
  "legacy.Material route selected": "已选择材料路线",
  "legacy.Material-saving paths for your plans": "计划的省材料方案",
  "legacy.Material-saving route choices": "会影响材料消耗的路线",
  "legacy.Medal conversion": "勋章可兑换",
  "legacy.Medals %d": "持有勋章 %d",
  "legacy.Minimum goal complete": "最低目标已完成",
  "legacy.Missing base equipment": "缺少可继续强化的基础装备",
  "legacy.Modify": "修改",
  "legacy.Monday": "星期一",
  "legacy.Move down": "下移",
  "legacy.Move up": "上移",
  "legacy.Multi-select uses OR; none means all": "多选取或；不选即全部",
  "legacy.Multiple decision nodes · display only": "多个分歧节点 · 仅展示",
  "legacy.Multiple material routes": "存在多种材料路线",
  "legacy.Multiple routes": "多路线",
  "legacy.My fleet days": "秘书舰日期",
  "legacy.Name": "装备名称",
  "legacy.New equipment plan": "新建装备计划",
  "legacy.Next target": "下一目标",
  "legacy.No active filters": "没有启用筛选",
  "legacy.No available assistant today": "今天没有可用秘书舰",
  "legacy.No comparable material costs more": "所有可比较材料都不更贵",
  "legacy.No detail plugins are enabled": "当前没有启用详情插件",
  "legacy.No improvement stages": "没有改修阶段",
  "legacy.No known predecessor": "没有已知前置装备",
  "legacy.No known upgrade target": "没有已知后续目标",
  "legacy.No matching assistant ship": "没有匹配的秘书舰",
  "legacy.No matching plans": "没有符合条件的计划装备",
  "legacy.No reachable improvement path found": "没有找到可达的改修路径",
  "legacy.No unfinished numeric plans": "没有未完成的具体计划",
  "legacy.No waiting plan": "没有等待其他日期的计划",
  "legacy.Normal attempt": "普通改修",
  "legacy.Normal attempts and guaranteed success save different materials": "普通尝试与确保成功各省不同材料，需要按库存取舍",
  "legacy.Normal attempts expected cost": "普通改修期望成本",
  "legacy.Normal attempts expected total": "普通改修期望总量",
  "legacy.Normal attempts have the lower expected cost": "普通尝试的期望总消耗更低",
  "legacy.Not applicable": "不适用",
  "legacy.Not available today": "今天不可改",
  "legacy.Not selected": "未选择",
  "legacy.Obtain base equipment": "先获得基础装备",
  "legacy.Only plans available today are shown here": "这里只显示今天能够执行的计划",
  "legacy.Only plans available today are shown here. Select one to open its improvement details.": "这里只显示今天可以执行的计划。选择装备后可打开其改修详情。",
  "legacy.Only routes that reach the same equipment but consume different materials are listed": "这里只列出最终得到相同装备、但会消耗不同材料的路线。",
  "legacy.Only show unfinished minimum goals": "只看最低目标尚未完成",
  "legacy.Only unfinished plans that can be acted on today are recommended": "只推荐今天能够执行的未完成计划",
  "legacy.Open panel settings to choose what appears here": "打开面板设置，选择这里要显示的内容。",
  "legacy.Open the game to load resource data": "进入游戏后即可读取资源数据",
  "legacy.Open the route chooser to compare materials before following this plan": "执行计划前打开路线选择，比较不同方案的材料消耗",
  "legacy.Owned count": "持有数量",
  "legacy.Owned equipment and plan progress": "持有情况与计划进度",
  "legacy.Owned equipment only": "仅个人持有",
  "legacy.Per-item estimate": "单件估算",
  "legacy.Plan and current inventory determine the next action": "结合计划目标和当前库存计算下一步",
  "legacy.Plan goals": "计划目标",
  "legacy.Plan list": "计划列表",
  "legacy.Plan status and equipment search": "计划状态与装备搜索",
  "legacy.Plan status filters can be combined": "计划状态可多选组合，选中状态会醒目标识",
  "legacy.Plan status is exclusive; equipment abilities can be combined": "计划状态互斥；装备能力可多选组合",
  "legacy.Plan still needs %d": "计划还差 %d",
  "legacy.Planned equipment": "计划装备",
  "legacy.Planned equipment that cannot be improved on the selected date": "已有计划但所选日期无法改修的装备",
  "legacy.Planned equipment that cannot be improved today": "已有计划但今天无法改修的装备",
  "legacy.Plans are shown as decisions and next actions, not only numbers": "计划按原因和下一步展示，不再只是目标数字",
  "legacy.Present box conversion": "礼物箱可兑换",
  "legacy.Present boxes %d": "持有礼物箱 %d",
  "legacy.Read the chain from left to right; each card keeps its own star stages, materials, and conversion branches": "从左向右阅读完整链路；每张卡片保留自身星级阶段、材料和转换分支",
  "legacy.Recommendations now follow this choice": "之后的推荐会按这条路线计算",
  "legacy.Remaining": "剩余",
  "legacy.Required equipment inputs": "所需装备投入",
  "legacy.Requires convertible reserves": "需要兑换储备资源",
  "legacy.Resource status unavailable": "资源状态尚不可用",
  "legacy.Resource to consume": "需要资材",
  "legacy.Restore defaults": "恢复默认",
  "legacy.Review every known same-result route and keep one preferred material path for later plans": "查看所有已知的同结果路线，并保存以后计划默认采用的材料路径",
  "legacy.Route choice required": "必须选择材料路线",
  "legacy.Route count": "%d 条路线",
  "legacy.Route not selected": "尚未选择",
  "legacy.Route screws to MAX": "★0 到 MAX 螺丝",
  "legacy.Routes that can produce this equipment": "可以获得该装备的路线",
  "legacy.Routes that continue from this equipment": "从该装备继续升级的路线",
  "legacy.Routes with the same equipment and star level share one node; branches and merges are staggered by topology": "相同装备与相同星级的路线合并到同一节点；分叉与汇合会按拓扑自动错位。",
  "legacy.Saturday": "星期六",
  "legacy.Save": "保存",
  "legacy.Save materials": "省螺丝助手",
  "legacy.Score": "评分",
  "legacy.Screw-saving assistant": "省螺丝助手",
  "legacy.Screws guaranteed short": "螺确",
  "legacy.Screws normal short": "螺普",
  "legacy.Scroll to browse the complete chain; branches and merges are staggered automatically; node contents scroll independently": "横向滚动查看完整链；分叉与汇合会自动错位；节点内容独立滚动。",
  "legacy.Search and filters": "搜索与筛选",
  "legacy.Search improvement list": "搜索装备、秘书舰或编号",
  "legacy.Search improvement plans": "搜索计划装备或装备类型",
  "legacy.Search once, then compare timing, ships, materials, and routes": "搜索一次即可比较日期、舰娘、材料和路线",
  "legacy.Search, filters, and sort": "搜索、筛选与排序",
  "legacy.See where this equipment comes from and what it can become": "查看这件装备从哪里来、还能变成什么",
  "legacy.Select equipment to inspect its timing, cost, and route": "选择装备后查看日期、成本和路线",
  "legacy.Select equipment to inspect timing and routes": "选择装备查看可改时间和路线",
  "legacy.Select equipment to inspect timing, total target cost, shortages, and routes in the details panel": "选择装备后，可在详情栏查看时间、目标总消耗、缺口和路线",
  "legacy.Select node to inspect route materials": "选择节点后查看路线材料",
  "legacy.Select one or more categories. Multiple categories use OR logic; selecting none shows all categories.": "可选择一个或多个分类；多个分类之间按“或”匹配，不选择则显示全部分类。",
  "legacy.Selected day": "所选日期",
  "legacy.Selected equipment": "选中的装备",
  "legacy.Selected equipment ID %d": "已锁定装备 ID %d",
  "legacy.Set or select an improvement route to calculate total cost": "设置或选择改修路线后计算总消耗",
  "legacy.Settings are saved separately for each page": "每个页面会分别保存自己的设置。",
  "legacy.Show all categories": "显示全部分类",
  "legacy.Show details": "显示详情",
  "legacy.Showing theoretical days until fleet data loads": "舰队数据载入前暂时显示理论日期",
  "legacy.Simple total estimate for %d remaining items": "剩余 %d 件的简单总量估算",
  "legacy.Special items": "特殊道具",
  "legacy.Starcraft": "改修计划",
  "legacy.Start from equipment to obtain": "从需要准备的装备开始",
  "legacy.Start from owned equipment": "从现有装备开始",
  "legacy.Start from your current equipment and expand every reachable improvement and conversion path to the plan goal": "从你现有装备出发，展开所有能到达计划目标的改修与更新路线",
  "legacy.Status filters": "状态筛选",
  "legacy.Still missing": "仍然缺少",
  "legacy.Strictly dominated in material requirements": "材料成本被另一条路线严格全面压过",
  "legacy.Strictly dominated under identical conditions": "同条件下存在绝对更省路线",
  "legacy.Strictly lower material requirements": "全部材料成本不高且至少一项更低",
  "legacy.Strictly lower total requirements": "同条件下全部成本不高且至少一项更低",
  "legacy.Structured guide entries": "结构化攻略条目",
  "legacy.Success-rate estimate": "成功率估算",
  "legacy.Sunday": "星期日",
  "legacy.Target already exists in inventory": "目标装备已经在库存中",
  "legacy.Target equipment": "目标装备",
  "legacy.The calculator shows main candidate routes, per-item cost, and a simple remaining-quantity estimate": "这里只展示主要候选路线、单件成本和剩余数量的简单估算",
  "legacy.The current dataset may not contain a route from your equipment to this goal": "当前数据可能没有包含从现有装备到该目标的完整路线",
  "legacy.The left list contains enough information to decide without opening details": "左侧已包含做什么和为什么做，无需打开详情也能判断",
  "legacy.The panel explains why, timing, cost, and routes": "这里会解释为什么做、何时做、成本和路线",
  "legacy.The panel shows reusable plan, route, and improvement plugins": "右侧由可复用的计划、路线和改修插件组成",
  "legacy.The panel shows timing, materials, and available routes": "这里显示可改时间、所需材料和可用路线",
  "legacy.The recommended route prefers today and fewer screws": "综合推荐优先考虑今天可做，其次选择更少螺丝",
  "legacy.The routes also produce different starting stars, so the cheaper-looking route may not be the better result": "这些路线得到的初始星级也不同，不能只看眼前少花了多少材料。",
  "legacy.Theoretical availability": "理论可改日期",
  "legacy.Theoretical days": "理论日期",
  "legacy.These choices are saved globally and reused when a future plan reaches the same upgrade branch": "这些选择会全局保存，之后计划经过相同升级分支时自动复用",
  "legacy.These choices change what materials will be consumed, so select a route before following the plan": "不同路线会吃掉不同材料，请先选定路线，再按计划改修。",
  "legacy.This chain contains a cycle. It is shown completely but is not managed or optimized in this version.": "该链路存在环形关系。本版本完整展示，但不参与管理或优化。",
  "legacy.This chain contains two or more decision nodes. It is shown completely but is not managed or optimized in this version.": "该链路包含两个或以上分歧节点。本版本完整展示，但不参与管理或优化。",
  "legacy.This plan has more than one route and the routes consume different materials": "这个计划有不止一种做法，而且不同做法会吃掉不同材料。",
  "legacy.This route is no more expensive in every comparable cost and saves at least one material": "在当前能比较的消耗里，这条路线没有任何一项更贵，并且至少能省下一种材料。",
  "legacy.Thursday": "星期四",
  "legacy.Today's route needs an assistant ship you do not own": "今天存在秘书舰条件，请在游戏内确认具体舰娘",
  "legacy.Total chain": "总链路",
  "legacy.Try changing search or filters": "可以尝试调整搜索内容或筛选条件。",
  "legacy.Tuesday": "星期二",
  "legacy.Type": "装备类型",
  "legacy.Unfinished": "未完成",
  "legacy.Unfinished goals": "未完成 %d 项",
  "legacy.Unfinished goals label": "未完成目标",
  "legacy.Unselected first": "未选择优先",
  "legacy.Upgrade guarantee advice": "更新时是否确保",
  "legacy.Upgrade records are MAX source equipment to target equipment at its result star level; intermediate star levels are collapsed": "升级记录按“装备 A ★MAX → 装备 B 的结果星级”展示；中间星级阶段折叠显示。",
  "legacy.Upgradeable": "可升级",
  "legacy.Use new interface": "使用新版界面",
  "legacy.Use the scrollbars or trackpad to move through the chain; material tables scroll independently": "使用滚动条或触控板浏览链路；材料表格可独立滚动",
  "legacy.View": "浏览",
  "legacy.View Mode": "浏览模式",
  "legacy.View complete upgrade chain": "查看完整升级链",
  "legacy.View full chain": "查看全链",
  "legacy.Wait %d days": "等待 %d 天",
  "legacy.Waiting for another day": "等待其他日期",
  "legacy.Wednesday": "星期三",
  "legacy.Weekday setting": "日期设置",
  "legacy.What should I do now": "我现在该做什么",
  "legacy.What to do now": "现在做什么",
  "legacy.What's New": "更新日志",
  "legacy.When can I do it": "什么时候能做",
  "legacy.Which route should I use": "应该走哪条路线",
  "legacy.Why am I doing these": "为什么要做这些",
  "legacy.Why do this": "为什么要做",
  "legacy.With plans": "已有计划",
  "legacy.Workbench": "工作台",
  "legacy.Your fleet availability": "秘书舰可改日期",
  "legacy.Your fleet has %d days per week": "每周可改 %d 天",
  "legacy.Your personal planner for crafting stars": "装备改修规划书",
  "legacy.upgrade to": "升级为",
  "plan.Add or change this equipment plan": "为这件装备添加或修改计划",
  "plan.Akashi": "明石",
  "plan.Akashi Kai": "明石改",
  "plan.All dimensions lower": "全部维度更低",
  "plan.Ammo": "弹药",
  "plan.Available": "可用",
  "plan.Ammo gap": "弹药缺口",
  "plan.Ammo short": "弹",
  "plan.Base equipment gap": "本装备缺口",
  "plan.Base equipment gaps are acquisition gaps and are not counted as consumed materials.": "本体装备缺口属于获取缺口，不计入被消耗材料。",
  "plan.Bauxite": "铝土",
  "plan.Bauxite gap": "铝土缺口",
  "plan.Bauxite short": "铝",
  "plan.Calculated from current equipment levels using the selected route": "按当前装备改修等级和所选路线计算",
  "plan.Calculation method": "计算方法",
  "plan.Candidate acquisition availability is not verified yet": "候选装备的实际获取方式暂未校验",
  "plan.Choose the starting equipment for this plan": "选择这个计划的起点装备",
  "plan.Choose the starting equipment for this plan target": "选择这个计划目标的起始装备",
  "plan.Choose this route": "选择这条路线",
  "plan.Consumable material": "普通材料",
  "plan.Cost calculation method": "消耗计算方法",
  "plan.Cost calculation scope": "消耗计算方法",
  "plan.Current inventory covers the nominal total": "当前库存可覆盖名义总消耗",
  "plan.Current plan": "当前计划",
  "plan.Existing": "现有",
  "plan.Plan": "计划",
  "plan.Custom goal": "自定义目标",
  "plan.Desired copies %d": "目标件数 %d",
  "plan.Development": "开发",
  "plan.Development materials": "开发资材",
  "plan.Development materials guaranteed total": "开发资材确保总消耗",
  "plan.Development materials normal total": "开发资材普通总消耗",
  "plan.Each converted plan will target one copy": "转换后的计划统一以 1 件为目标数量。",
  "plan.Enough": "充足",
  "plan.Fuel": "燃料",
  "plan.Fuel gap": "燃料缺口",
  "plan.Fuel short": "燃",
  "plan.Gap %d": "缺口 %d",
  "plan.Goal count": "目标数量",
  "plan.Guaranteed": "确保",
  "plan.Guaranteed total": "确保总消耗",
  "plan.Important": "重要",
  "plan.Improvement": "改修",
  "plan.Improvement actions total": "改修次数总计",
  "plan.Improvement materials": "改修资材",
  "plan.In inventory": "库存已有",
  "plan.Inventory unavailable": "库存数据不可用",
  "plan.Keep this route": "保持这条路线",
  "plan.Material": "材料",
  "plan.Material equipment": "素材装备",
  "plan.Materials still missing": "仍有材料缺口",
  "plan.Minimum screws": "最少改修资材",
  "plan.Minimum improvement materials": "最少改修资材",
  "plan.Minimum improvement materials compares normal expected consumption with guaranteed consumption at each improvement step and selects the option using fewer improvement materials.": "最少改修资材会在每个改修阶段比较普通方案的期望消耗与确保方案的消耗，并选择改修资材更少的一方。",
  "plan.No plan yet": "尚未设置计划",
  "plan.No route candidate can reach this plan target": "当前没有可到达该计划目标的路线候选",
  "plan.None": "无",
  "plan.Normal": "普通",
  "plan.Normal expected total": "普通期望总消耗",
  "plan.Normal shows expected consumption based on Akashi Kai success rates; guaranteed uses the fixed guaranteed-success costs recorded for the route.": "普通按明石改成功率计算期望消耗；确保采用该路线记录的确保成功固定消耗。",
  "plan.Obtain first": "先获取",
  "plan.Other materials": "其它耗材",
  "plan.Owned": "持有",
  "plan.Owned starting equipment": "库存中的起始装备",
  "plan.Plan starting equipment": "计划起点装备",
  "plan.Plan settings": "计划设置",
  "plan.Plan target": "计划目标",
  "plan.Plan target already complete": "改修目标已经完成",
  "plan.Remove": "删除",
  "plan.Remove plan": "删除计划",
  "plan.Required equipment and items": "所需装备与道具",
  "plan.Reserved for plan targets %d": "计划目标预留 %d",
  "plan.Route %d": "路线 %d",
  "plan.Screws": "螺丝",
  "plan.Screws guaranteed total": "改修资材确保总消耗",
  "plan.Screws normal total": "改修资材普通总消耗",
  "plan.Selected route": "当前选择",
  "plan.Set a concrete plan target to calculate total cost": "设置具体改修目标后才能计算总消耗",
  "plan.Set plan": "设置计划",
  "plan.Set the same goal for all": "统一设置计划",
  "plan.Steel": "钢材",
  "plan.Steel gap": "钢材缺口",
  "plan.Steel short": "钢",
  "plan.The plan keeps only the final equipment and star; this route choice is stored separately": "计划只保存最终装备和星级；本次路线选择单独保存",
  "plan.This choice determines the following upgrade route and changes material consumption": "这个选择会决定后续升级路线，影响材料消耗",
  "plan.This equipment cannot be improved and is not an evolution-chain endpoint": "该装备不可改修，也不是进化链末端装备",
  "plan.This equipment is the end of an evolution chain and can only be planned at ★+0": "该装备处于进化链末端，只允许设置 ★+0 计划",
  "plan.Total": "总需求",
  "plan.Total cost to plan target": "到改修目标的总消耗",
  "plan.Trade-off route": "存在取舍",
  "plan.Two-way branch points: %d": "双分支升级点：%d",
  "plan.Unowned starting candidate": "未持有的起点候选",
  "plan.Upgrade steps: %d": "升级步骤：%d",
  "plan.Your old plans need one choice": "先处理一下旧版计划",
  "plan.upgrade": "升级",
  "plugin_description": "查看改修相关增强数据，改修计划管理，提供改修建议。",
  "shared.Category %d": "分类 %d",
  "shared.Category filter active": "装备分类筛选已启用",
  "shared.Clear search": "清除搜索",
  "shared.Collapsed": "已折叠",
  "shared.Equipment category": "装备分类",
  "shared.Equipment category filter": "装备分类筛选",
  "shared.Expanded": "已展开",
  "shared.Owned": "持有",
  "shared.Plan target": "计划目标",
  "shared.Search": "搜索",
  "shared.Search results": "找到 %d 件",
  "shared.Select equipment to see the decision details": "选择一件装备查看决策详情",
  "shared.upgrade": "升级",
  "workbench.%d days per week": "每周 %d 天",
  "workbench.Active conditions %d": "已启用 %d 个条件",
  "workbench.All equipment": "全部装备",
  "workbench.Ammo": "弹药",
  "workbench.Assistant ship": "秘书舰",
  "workbench.Available days for this admiral": "秘书舰可改日期",
  "workbench.Secretary ship days": "秘书舰可改日期",
  "workbench.Available days per week": "每周可改天数",
  "workbench.Available in your fleet": "秘书舰条件",
  "workbench.Available today": "今天可改",
  "workbench.Bauxite": "铝土",
  "workbench.Choose a route in the equipment page": "请先在计划管理中选择路线",
  "workbench.Complete upgrade chain and current position": "进化链路",
  "workbench.Current plan": "当前计划",
  "workbench.Date": "日期",
  "workbench.Development materials": "开发资材",
  "workbench.Estimated per-step success rate %s": "成功率 %s",
  "workbench.Expected attempts %s": "预计尝试 %s 次",
  "workbench.Few available days": "可改天数少",
  "workbench.Filter by weekday": "按周几筛选",
  "workbench.Final improvement targets available on selected day": "所选日期可执行的最终改修目标",
  "workbench.Final improvement targets available today": "今天可执行的最终改修目标",
  "workbench.Finish sooner": "更快完成优先",
  "workbench.Fri": "五",
  "workbench.Fuel": "燃料",
  "workbench.Guaranteed fixed materials": "确保固定材料",
  "workbench.Guaranteed success": "确保成功",
  "workbench.Improvement details": "改修详情",
  "workbench.Long improvement cycle": "长期计划优先",
  "workbench.Materials for this upgrade": "本次升级材料期望",
  "workbench.Mon": "一",
  "workbench.No": "否",
  "workbench.No assistant restriction": "不限秘书舰",
  "workbench.No assistant available on selected weekday": "所选星期没有可用秘书舰",
  "workbench.No matching equipment": "没有符合条件的装备",
  "workbench.No material cost": "无额外材料消耗",
  "workbench.No unfinished plan is available on selected day": "所选日期没有可执行的未完成计划",
  "workbench.No unfinished plan is available today": "今天没有可执行的未完成计划",
  "workbench.Non-guaranteed expected materials": "非确保期望材料",
  "workbench.Not owned": "游戏内确认",
  "workbench.Plan equipment": "计划装备",
  "workbench.Rare weekly opportunity": "每周机会较少",
  "workbench.Recommended order": "综合推荐",
  "workbench.Reference probabilities are estimates, not official exact rates": "参考成功率是估算值，并非官方公开的精确概率",
  "workbench.Route %d": "路线 %d",
  "workbench.Sat": "六",
  "workbench.Screws": "螺丝",
  "workbench.Search and sort": "搜索与排序",
  "workbench.Search equipment, assistant ship, or upgrade target": "搜索装备、秘书舰或更新目标",
  "workbench.Search results title": "搜索结果",
  "workbench.Skipping today waits %d days": "今天错过需要再等 %d 天",
  "workbench.Skipping waits %d days": "错过需再等 %d 天",
  "workbench.Sort today by": "排序方式",
  "workbench.Sorting and equipment search": "排序与装备搜索",
  "workbench.Steel": "钢材",
  "workbench.Sun": "日",
  "workbench.The plan keeps only the final equipment and star; this route choice is stored separately": "计划只保存最终装备和星级；本次路线选择单独保存",
  "workbench.The saved route no longer matches the current improvement data": "已保存的路线无法匹配当前改修数据",
  "workbench.Thu": "四",
  "workbench.Today": "今天",
  "workbench.Tue": "二",
  "workbench.Unavailable": "不可改",
  "workbench.Wed": "三",
  "workbench.Yes": "是",
  "workbench.upgrade": "升级",
  "shared.Zoom out": "缩小",
  "shared.Zoom in": "放大",
  "shared.Reset zoom": "重置缩放",
  "blacklist.Select all": "全选",
  "blacklist.Add blacklist": "添加低优先装备",
  "blacklist.Remove blacklist": "移出低优先装备",
  "blacklist.Search equipment": "搜索装备",
  "blacklist.Acquisition source": "出处",
  "blacklist.No stable acquisition source": "暂无稳定出处",
  "blacklist.No equipment available to add": "没有可添加的装备",
  "equipment.Select all": "全选",
  "plan.Choose a target star and quantity before calculating total consumption and shortages.": "选择目标星级和数量后，才能计算总消耗与缺口。",
  "data.Import summary %d plans %r routes": "%d 个计划 · %r 个路线选择",
  "data.Test profiles add material-route plans without deleting unrelated plans": "测试档案会添加材料路线计划，不会删除无关计划",
  "app.The interface focuses on Today and Plan management, with filters, material estimates, and upgrade routes in one workspace.": "界面围绕“今天改什么”和“计划管理”组织，并把筛选、材料预估与升级路线集中在同一工作区。",
  "app.Six key functions": "六个重点功能",
  "app.Switch between Today and Plan management": "切换今天改什么与计划管理",
  "app.Use Today for executable work and Plan management for long-term targets.": "“今天改什么”用于执行当前步骤，“计划管理”用于维护长期目标。",
  "app.Search and sort equipment": "搜索与排序装备",
  "app.Filter by equipment text, weekday, category, and primary or secondary sort.": "可按装备文本、星期、分类以及主排序和次排序快速筛选。",
  "app.Review plan targets available today": "查看今日可改",
  "app.The left list shows plans that can be acted on for the selected weekday.": "左侧列表只展示所选星期能够执行的计划目标。",
  "app.Review the system-recommended improvement starting point": "查看系统推荐的改造起点",
  "app.Right shows the starting point calculated from the selected route and current inventory.": "右侧展示根据已选路线和当前库存计算出的改造起点。",
  "app.Compare expected and guaranteed costs": "对比期望与确保消耗",
  "app.Use both estimates to plan fuel, materials, equipment consumption, and screws.": "结合两种估算安排资源、装备耗材与改修资材。",
  "app.Follow the current upgrade route": "查看当前升级路线",
  "app.See the current stage, later steps, and the final target in one chain.": "在同一条链路中查看当前阶段、后续步骤与最终目标。",
  "app.Detailed guides": "详细图文指南",
  "app.Equipment category guide": "装备分类说明",
  "app.Select one or more purpose groups. Use All categories to return to an unfiltered list.": "可按用途选择一个或多个分类；使用“全部分类”恢复为不过滤状态。",
  "app.Equipment blacklist guide": "低优先装备说明",
  "app.Review exclusion reasons, add recommended or manual entries, and remove multiple items at once.": "查看排除理由，添加推荐或手动条目，并可一次批量移除多件装备。",
  "equipment.Plan target": "计划目标",
  "shared.System-recommended improvement starting point": "系统推荐的改造起点",
  "shared.Select a valid route before the system can recommend a starting point": "选择有效路线后，系统才能推荐改造起点",
  "shared.Corresponding plan target": "对应计划目标",
  "shared.Current plan target": "当前计划目标",
  "shared.For plan": "用于",
  "shared.Parent plan": "父计划",
  "shared.Related plans": "相关计划",
  "shared.Consumable plan": "耗材计划",
  "shared.User plans": "用户计划",
  "shared.Consumable plans": "耗材计划",
  "workbench.Plan targets": "计划目标",
  "workbench.Plan targets available for improvement on selected day": "今日可改",
  "workbench.No plan target is available for improvement on selected day": "当天没有需要处理的未完成计划目标",
  "app.Left shows Plan targets that satisfy the selected day's improvement conditions.": "左侧展示当天满足改修条件的计划目标。",
  "app.Review Current Plan actions today": "查看今天要做什么",
  "app.Left shows the next Current Plan action, including acquisition before improvement.": "左侧列出今天可以处理的计划，包括需要先获得装备的情况。",
  "app.Right shows the selected Current Start; low-cost acquisition and equipment-conversion Alternatives remain user-selectable.": "右侧显示这份计划从哪里开始；获取方案和装备升级方案仍由你选择。",
  "data.Data management": "数据管理",
  "data.Export plans, route choices, and interface settings to a data file": "导出改修计划、路线选择和界面设置。",
  "data.Import plans, route choices, and interface settings from a data file": "从数据文件导入改修计划、路线选择和界面设置。",
  "app.Data sources": "数据来源",
  "app.Akashi-List, wikiwiki.jp, KcWiki-Api, KC3": "Akashi-List、wikiwiki.jp、KcWiki-Api、KC3",
  "data.Plugin updates do not delete this file": "更新插件不会删除这个文件。",
  "workbench.Today execution chain": "进化链路",
  "workbench.Current executable equipment": "当前可执行装备",
  "workbench.Current star target": "当前星级目标",
  "workbench.MAX before conversion": "转换前 ★MAX",
  "workbench.Evolution target": "进化目标",
  "workbench.Evolution chain": "进化链路",
  "equipment.Search and sort": "搜索与排序",
  "workbench.Clear filters": "清除筛选",
  "workbench.Display scope": "显示范围",
  "workbench.Today improvable": "今天改什么",
  "equipment.Plan %d": "计划 %d",
  "workbench.Available dates": "可改日期",
  "workbench.Expected materials for this upgrade": "本次升级期望材料",
  "shared.Interface density": "界面密度",
  "shared.Compact density": "紧凑",
  "shared.Standard density": "标准",
  "shared.Comfortable density": "宽松",
  "workbench.Upgrade route": "改修路线",
  "workbench.Required / owned": "需求 / 持有",
  "workbench.Development": "开发",
  "workbench.Improvement source": "改修来源",
  "workbench.Periodic quest": "周期任务",
  "workbench.Quest": "任务",
  "workbench.Occupied by another plan": "已被其他计划占用",
  "workbench.This equipment instance is already occupied by another plan": "这件装备已被另一份计划使用",
  "workbench.Resolve the earlier Current first; this plan will not manufacture an extra copy automatically.": "请先处理前面的计划；这份计划不会自动假定多出一件装备。",
  "equipment.Occupied by another plan": "已被其他计划占用",
  "workbench.Ship source": "舰娘来源",
  "workbench.Acquire Current start": "获取当前起点",
  "workbench.Obtain this Current start before improvement": "改修前先获得这份计划需要的起点装备",
  "workbench.The selected Current start is not owned yet; acquire it first, then continue the selected route.": "当前还没有选中的起点装备；先通过下面的方式获得，再继续所选路线。",
  "workbench.Ship remodel at Lv.%d": "Lv.%d 舰娘改造获得",
  "workbench.Ship initial equipment": "初始装备",
  "workbench.Sources": "来源",
  "workbench.No known source": "暂无已知来源",
  "workbench.Search sources": "搜索来源",
  "workbench.No matching source": "没有匹配的来源",
  "workbench.How to obtain %s": "如何获得 %s",
  "workbench.Still needed %d": "还缺 %d",
  "workbench.This is a temporary material target and does not change Plans": "这是临时耗材目标，不会修改计划",
  "workbench.Choose a temporary prerequisite route": "选择临时前置路线",
  "workbench.Unknown source": "未知来源",
  "workbench.Current next improvement": "当前下一步改修",
  "workbench.Recommended improvement target": "推荐改修目标",
  "workbench.No improvement route can currently produce this material": "当前没有可用于获得该耗材的改修路线",
  "equipment.Small-caliber main guns": "小口径主炮",
  "equipment.Medium-caliber main guns": "中口径主炮",
  "equipment.Large-caliber main guns": "大口径主炮",
  "equipment.Secondary guns": "副炮",
  "equipment.Torpedoes": "鱼雷",
  "equipment.Carrier fighters": "舰上战斗机",
  "equipment.Carrier dive bombers": "舰上爆击机",
  "equipment.Carrier torpedo bombers": "舰上攻击机",
  "equipment.Carrier reconnaissance aircraft": "舰上侦察机",
  "equipment.Seaplane reconnaissance aircraft": "水上侦察机",
  "equipment.Seaplane bombers": "水上爆击机",
  "equipment.Small radars": "小型电探",
  "equipment.Large radars": "大型电探",
  "equipment.Sonars": "声呐",
  "equipment.Depth charges": "爆雷",
  "equipment.Armor": "追加装甲",
  "equipment.Engines": "机关部强化",
  "equipment.Anti-air shells": "对空强化弹",
  "equipment.AP shells": "对舰强化弹",
  "equipment.VT fuzes": "VT引信",
  "equipment.Anti-air machine guns": "对空机枪",
  "equipment.Midget submarines": "特殊潜航艇",
  "equipment.Emergency repair personnel": "应急修理要员",
  "equipment.Landing craft": "登陆用舟艇",
  "equipment.Autogyros": "旋翼机",
  "equipment.ASW patrol aircraft": "反潜哨戒机",
  "equipment.Medium armor": "中型追加装甲",
  "equipment.Large armor": "大型追加装甲",
  "equipment.Searchlights": "探照灯",
  "equipment.Transport drums": "运输桶",
  "equipment.Ship repair facilities": "舰艇修理设施",
  "equipment.Submarine torpedoes": "潜水舰鱼雷",
  "equipment.Star shells": "照明弹",
  "equipment.Command facilities": "司令部设施",
  "equipment.Aviation personnel": "航空要员",
  "equipment.Anti-air fire directors": "高射装置",
  "equipment.Anti-ground equipment": "对地装备",
  "equipment.Large flying boats": "大型飞行艇",
  "equipment.Surface ship personnel": "水上舰要员",
  "equipment.Large sonars": "大型声呐",
  "equipment.Special seaplanes": "特殊水上机",
  "equipment.Special support equipment": "特殊支援装备",
  "equipment.Seaplane fighters": "水上战斗机",
  "equipment.Amphibious tanks": "特型内火艇",
  "equipment.Special landing equipment": "特殊登陆装备",
  "equipment.Special anti-air equipment": "特殊对空装备",
  "equipment.Special submarine equipment": "特殊潜水舰装备",
  "equipment.Jet aircraft": "喷气式飞机",
  "equipment.Special rotorcraft": "特殊旋翼机",
  "equipment.Submarine radar equipment": "潜水舰电探装备",
  "equipment.Equipment category %d": "装备分类 #%d",
  "plan.Plan %d": "计划 %d",
  "plan.Upgrade route planning": "升级链路规划",
  "plan.Choose one complete route for each plan copy": "为每个计划选择一条完整升级线路",
  "plan.Route pending": "待选择线路",
  "plan.Waiting for route selection": "等待选择线路",
  "plan.Current inventory start": "当前库存起点",
  "plan.Theoretical start from zero": "从 ★0 理论起点开始",
  "plan.From star zero": "从 ★0 开始",
  "plan.Upgrade output": "升级后装备",
  "plan.Prerequisite upgrade step %d": "前置升级步骤 %d",
  "plan.Upgrade source": "升级前装备",
  "plan.Step materials": "本步骤材料",
  "plan.The system automatically chooses the best current inventory start after the route is selected": "选择线路后，系统会自动选择最合适的当前库存起点。",
  "plan.Only the complete route is chosen manually; the current starting equipment and all costs are calculated automatically.": "只需要手动选择完整线路；当前起点装备和全部消耗由系统自动计算。",
  "equipment.Choose a complete route for every plan before calculating total consumption and shortages": "请先为每个计划选择完整线路，再计算总消耗与缺口。",
  "equipment.Current equipment improvement route": "本装备改修路线",
  "equipment.Choose a prerequisite route for every plan before calculating total consumption and shortages": "请先为每个计划选择前置升级链路，再计算总消耗与缺口。",
  "plan.Prerequisite route %d": "前置路线 %d",
  "plan.Prerequisite route pending": "前置路线待选择",
  "plan.Selected prerequisite route": "已选择前置路线",
  "plan.Keep this prerequisite route": "保持此前置路线",
  "plan.Choose this prerequisite route": "选择此前置路线",
  "plan.Current equipment output": "本装备产出",
  "plan.The system automatically chooses the best current inventory start after the prerequisite route is selected": "选择前置路线后，系统会自动选择最合适的现有库存起点。",
  "plan.No prerequisite upgrade route is required": "无需前置升级链路",
  "plan.The current equipment improvement route above determines the remaining improvement costs.": "后续改修消耗由上方的本装备改修路线决定。",
  "plan.Prerequisite upgrade route planning": "前置升级链路规划",
  "plan.Set a concrete plan target first": "请先设置具体计划目标",
  "plan.Choose the target star and quantity in plan management above. Prerequisite routes will appear here immediately afterward.": "请在上方计划管理中设置目标星级和数量；设置后，前置升级链路会立即显示在这里。",
  "plan.The target exists, but no complete prerequisite route can be built from the current improvement data.": "计划目标已经存在，但当前改修数据无法构造可到达该目标的完整前置升级链路。",
  "plan.Choose one prerequisite route for each plan copy": "为每个计划副本选择一条前置升级链路",
  "plan.Choose only the prerequisite route here. The current equipment route is selected above, while inventory starts and total costs are calculated automatically.": "这里只选择前置升级链路；本装备改修路线在上方选择，库存起点和总消耗由系统自动计算。",
  "plan.Open prerequisite route planner": "打开规划",
  "plan.Planned %d of %d plan copies": "已规划 %d / %d 个计划",
  "plan.All plan copies have prerequisite routes. Open the planner to review or change them.": "所有计划副本均已选择前置升级链路，可以打开规划器检查或修改。",
  "plan.Open the planner to choose a prerequisite route for each remaining plan copy.": "打开规划器，为每个尚未完成的计划副本选择前置升级链路。",
  "plan.Restore window": "还原窗口",
  "plan.Maximize": "最大化",
  "plan.Drag the lower-right corner to resize the window": "拖动窗口右下角可调整大小",
  "plan.Close": "关闭",
  "plan.Preparing prerequisite routes": "正在准备前置升级链路",
  "plan.The planner opens first, then prepares route details without blocking the main interface.": "规划窗口会先立即打开，再异步准备路线详情，不阻塞主界面。",
  "plan.The configured plan target is already complete": "已配置的计划目标已经完成",
  "plan.Prerequisite route planning is not available for this equipment": "此装备不适用前置升级链路规划",
  "plan.Current inventory already satisfies every configured goal, so no additional prerequisite route is needed.": "当前库存已经满足全部计划目标，无需追加前置升级链路。",
  "plan.This equipment is outside the prerequisite route planner policy and is handled by its direct plan rules.": "此装备不在前置路线规划策略范围内，将按本装备直接计划规则处理。",
  "plan.The target is still pending, but no complete prerequisite route can be built from the current improvement data.": "计划目标仍未完成，但当前改修数据无法构造完整前置升级链路。",
  "plan.Current inventory already satisfies every configured goal, so no additional consumption or shortage remains.": "当前库存已经满足全部计划目标，不再有新增消耗或缺口。",
  "plan.Prerequisite route selection is still incomplete": "前置升级链路尚未全部选择",
  "plan.Choose a prerequisite route for every remaining plan copy before calculating total consumption and shortages.": "请为每个剩余计划副本选择前置升级链路后，再计算总消耗与缺口。",
  "plan.Total consumption is unavailable for the current plan": "当前计划无法计算总消耗",
  "plan.The plan is still pending, but the current route data cannot produce a complete cost projection.": "计划仍未完成，但当前路线数据无法生成完整的成本投影。",
  "workbench.Prerequisite upgrade route planning": "前置升级链路规划",
  "workbench.This plan contains material-affecting prerequisite route branches": "该计划的完整前置链路包含会影响材料消耗的分歧，可随时打开规划器检查或修改。",
  "workbench.Choose a prerequisite route for this plan": "请为该计划选择前置升级链路",
  "workbench.The selected prerequisite branch is stored per plan copy and drives material calculation": "前置分歧按计划副本单独保存，并直接决定材料与总消耗计算。",
  "equipment.Open complete upgrade chain": "打开完整升级链路",
  "workbench.Open plan management and choose route": "前往计划管理选择路线",
  "plan.Locked by plan %d": "已被计划 %d 锁定",
  "plan.This inventory equipment is already reserved by another plan copy": "这件库存装备已被另一个计划锁定，不能重复选择。",
  "plan.One route is calculated from one inventory equipment to the final target": "每条路线汇总一件库存装备到最终目标的全部消耗。",
  "plan.Final plan target": "最终计划目标",
  "plan.Each candidate is one inventory equipment to the final target. Equipment reserved by another plan copy cannot be selected again.": "每个候选表示一件库存装备到最终目标；已被其他计划锁定的装备不能重复选择。",
  "plan.Each route automatically uses its best available unlocked inventory start": "每条路线自动使用当前最优且未被锁定的库存起点。",
  "plan.Choose a complete route. Its best unlocked inventory start is assigned automatically and reserved for this plan.": "请选择一条完整路线；系统会自动分配该路线当前最优的未锁定库存起点，并由本计划独占。",
  "plan.Only prerequisite route selected automatically": "唯一前置路线已自动确定",
  "plan.Only one effective prerequisite route remains, so it is applied automatically.": "当前只剩一条有效前置路线，系统已自动采用，无需手动选择。",
  "plan.Reassign starting equipment": "选择其他起点",
  "plan.The prerequisite route is fixed; confirm a new starting equipment assignment.": "前置路线已经确定，请重新确认从哪件装备开始。",
  "blacklist.Reason direct upgrades are developable": "低优先理由：所有直接升级产物均可开发获得。",
  "blacklist.Reason direct upgrades are recurring quest rewards": "低优先理由：所有直接升级产物均可由周期任务获得，且不会被其他改修消耗。",
  "blacklist.Reason direct upgrades are low value": "低优先理由：所有直接升级产物都可开发，或可由舰娘／周期任务获得且不会被其他装备改修消耗。",
  "blacklist.Reason direct upgrades have measurable repeatable sources": "低优先理由：所有直接升级产物都可由舰娘或周期任务获得，且不会被其他装备改修消耗。",
  "blacklist.Reason concrete details": "低优先理由：%s",
  "blacklist.Reason detail developable": "升级产物「%s」可开发获得",
  "blacklist.Reason detail repeatable source": "升级产物「%s」可由%s获得，且不作为其他装备的改修材料",
  "blacklist.Reason detail repeatable source unknown": "升级产物「%s」具有可重复获取来源，且不作为其他装备的改修材料",
  "blacklist.Reason ship initial source": "%s（初始装备）",
  "blacklist.Reason ship remodel source": "%s（Lv.%d 改造获得）",
  "blacklist.Reason more ship sources": "另%d个舰娘来源",
  "blacklist.Reason ship sources": "舰娘：%s",
  "blacklist.Reason quest sources": "周期任务：%s",
  "blacklist.Reason separator": "；",
  "app.Failed to prepare improvement decisions": "改修决策准备失败",
  "app.Retry": "重试",
  "plan.Required route start": "路线所需起点",
  "plan.Starting equipment unassigned": "起点装备未分配",
  "plan.Required starting equipment": "所需起点装备",
  "plan.Common acquisition alternative": "常见来源备选",
  "plan.Common acquisition alternatives": "常见来源备选",
  "plan.Periodic quest": "周期任务",
  "plan.Ship farming": "养殖",
  "plan.Future route start after acquisition": "获取后的未来起点",
  "plan.This is only a future alternative. It does not truncate the current route or reserve inventory until the equipment is actually owned.": "这里只是未来备选；装备真正入库前，不会截断当前路线，也不会占用库存。",
  "plan.These are independent strategy branches; only owned equipment truncates the current route.": "这些是独立的策略备选；只有真实持有的装备才能截断当前路线。",
  "plan.Current inventory alternative": "当前库存备选",
  "plan.Other current inventory paths": "其他当前库存阶段路径",
  "plan.These are real owned staged starts. The first path remains the automatic execution choice; the others stay available as backups.": "这些都是真实持有的阶段起点。第一条仍作为自动执行方案，其余保留为可用备选。",
  "workbench.Routes to decide": "待确定路线",
  "workbench.Select an item to resolve its prerequisite route": "选择装备后处理其前置升级路线",
  "workbench.Starting point is decided after route selection": "选择路线后再自动确定实际起点",
  "workbench.The item stays outside Today until its current route is resolved": "当前路线确定前，该装备不会进入“今日可改”主列表。",
  "plan.Choose the route that remains relevant from Current": "只选择从当前节点开始仍然有效的路线",
  "plan.The saved route is no longer relevant; Current has been re-resolved from live inventory.": "已保存的历史路线已不再影响当前执行；系统已按实时库存重新解析当前节点。",
  "plan.Only one effective prerequisite route remains from Current, so it is applied automatically.": "从当前节点开始只剩一条有效前置路线，已自动采用。",
  "plan.Choose the route that changes what Current should work on now.": "请选择会改变当前应处理装备的路线。",
  "workbench.Only a route that changes Current execution needs to be selected; historical upstream branches do not block Today": "只有会改变当前执行的路线才需要选择；已经位于当前节点之前的历史分支不会阻塞“今天改什么”。",
  "workbench.Choose the prerequisite route for Current": "选择当前执行的前置路线",
  "workbench.Current starting point is derived from live inventory after route choice": "路线确定后，当前起点由实时库存自动派生",
  "plan.Current route needs selection": "当前路线需要选择",
  "plan.Current route is resolved": "当前路线已解析",
  "plan.Current route is resolved. Open the planner to review the route facts or choose another current path.": "当前路线已解析。可打开规划器查看路线事实或选择另一条当前路径。",
  "plan.Open the planner to choose the route that changes what Current should work on now.": "打开路线选择，确定这份计划现在从哪里继续。",
  "plan.Choose the prerequisite route that remains ambiguous at Current before calculating the current route cost.": "先选择仍有分歧的前置路线，再计算当前剩余消耗。",
  "plan.Choose the target star and quantity in plan management above. Current start candidates will appear here immediately afterward.": "请先在上方计划管理中设置目标星级和数量，随后这里会立即生成当前起点候选。",
  "plan.Current inventory already satisfies every configured goal, so no Current start is needed.": "当前库存已经满足所有已配置目标，不需要当前起点。",
  "plan.Current start candidate planning": "当前起点候选",
  "plan.Current start is resolved": "当前起点已确定",
  "plan.Current start is resolved. Open the planner to review all conservative candidates or choose another start.": "起点已经确定。可查看可选起点，或需要时选择其他起点。",
  "plan.Current start needs selection": "当前起点待选择",
  "plan.Current start planning is not available for this equipment": "该装备不适用当前起点搜索",
  "plan.No current start candidate can reach this plan target": "没有可到达该计划目标的当前起点候选",
  "plan.No prerequisite Current start search is required": "无需搜索前置当前起点",
  "plan.Open current start planner": "打开改修起点选择",
  "plan.Open the planner to choose what Current should start from now.": "请选择这份计划从哪里开始。",
  "plan.Preparing current start candidates": "正在准备当前起点候选",
  "plan.The planner opens first, then prepares Current start candidates without blocking the main interface.": "先打开页面，再在后台准备可选起点，不阻塞主界面。",
  "plan.The target is still pending, but no conservative Current start candidate can be found from the current improvement data.": "目标尚未完成，但目前找不到可以完成这个目标的起点。",
  "plan.This equipment is outside Current start search policy and is handled by its direct plan rules.": "这件装备可以直接作为起点，无需另外选择。",
  "plan.Assistant ship byproduct": "改修舰娘伴生产物",
  "plan.Candidates are conservatively collected; the system does not choose the best route for you.": "存在多个可行起点，请选择你希望使用的方案。",
  "plan.Choose the start that Current should act on now": "请选择这份计划从哪里开始",
  "plan.Choose this current start": "选择这个当前起点",
  "plan.Choose which conservative Current start should be used now.": "请选择这份计划要使用的起点。",
  "plan.Conservative acquisition start": "需要先获得",
  "plan.Current start candidate %d": "当前起点候选 %d",
  "plan.Current start pending": "当前起点待选择",
  "plan.Current start selected": "当前起点已选择",
  "plan.Keep this current start": "保持这个当前起点",
  "plan.Only current start selected automatically": "唯一当前起点已自动采用",
  "plan.Only one current start candidate": "只有一个当前起点候选",
  "plan.Only one current start candidate remains, so it is applied automatically.": "只剩一个当前起点候选，因此自动采用。",
  "plan.Selected current start": "已选当前起点",
  "plan.Current route": "当前线路",
  "plan.Current route details": "当前线路详情",
  "plan.View current route": "查看当前线路",
  "plan.Key upgrade": "关键升级",
  "plan.Assistant ship": "秘书舰",
  "plan.Ship equipment": "舰娘初始/改造装备",
  "workbench.Choose the Current start": "选择当前起点",
  "workbench.Current start candidate planning": "当前起点候选",
  "workbench.Only Current start candidates matter now; historical upstream branches do not block Today": "只需要选择这份计划接下来从哪里开始；已经走过的上游路线不会阻塞“今天改什么”。",
  "workbench.The saved Current start no longer matches the current improvement data": "已保存的当前起点已不符合当前改修数据",
  "workbench.This Current Plan has more than one conservative start candidate": "这份计划有多个可选起点",
  "workbench.Candidates are derived from the live graph and inventory; you choose the Current start": "这些起点来自当前改修路线与仓库，请选择从哪里开始。",
  "workbench.Current starts to decide": "待选择当前起点",
  "workbench.Select an item to choose its Current start": "选择一份计划，为它确定从哪里开始",
  "workbench.The item stays outside Today until its Current start is resolved": "当前起点确定之前，该装备不会进入“今天改什么”",
  "shared.Choose a Current start before this plan can enter Today": "选择当前起点后，这个计划才能进入“今天改什么”",
  "shared.Current improvement starting point": "当前改修起点",
  "plan.Choose a Current start candidate before calculating the current execution cost.": "先选择这份计划从哪里开始，再计算剩余消耗。",
  "plan.Current start selection is still incomplete": "当前起点尚未选择",
  "workbench.Choose a temporary Current start": "选择临时改修起点",
  "workbench.Current improvement starting point": "当前改修起点",
  "app.Review the current improvement starting point": "查看计划从哪里开始",
  "app.Right shows the Current Start selected from conservative candidates and current inventory.": "右侧显示这份计划已经确定的起点。",
  "app.Low-priority equipment guide": "低优先装备指南",
  "app.Review low-priority reasons, add recommended or manual entries, and remove multiple items at once.": "查看低优先原因，添加推荐或手动条目，并可批量移除。",
  "plan.Quest": "任务",
  "plan.Later branches are deferred until the Current reaches the real decision point.": "后续升级分歧会在计划推进到对应节点时再选择。",
  "equipment.Current instance route changed": "这件装备现在无法继续原计划路线",
  "workbench.Current instance changed": "这份计划使用的装备已经变化",
  "workbench.The bound equipment is outside the currently reachable route": "这件装备现在无法继续这份计划",
  "workbench.The concrete api_id is kept; the system will not silently switch to another equipment instance.": "仍使用原来的这件装备，不会自动更换。",
  "plan.Current decision target": "当前决策目标",
  "plan.Current start equipment is occupied by another plan": "当前起点装备已被其他计划占用",
  "plan.A matching concrete equipment instance exists, but it is already bound to another Current. Resolve that conflict before creating another acquisition demand.": "已有符合条件的装备被另一份计划使用，请先处理那份计划。",
  "app.Existing equipment": "现有装备",
  "equipment.Equipment not acquired": "未获得装备",
  "workbench.Sort today": "今天排序",
  "workbench.No plan target needs action today": "今天没有需要处理的计划目标",
  "plan.Add plans": "新增计划",
  "plan.Quantity can be added in one operation": "一次可以新增多件数量",
  "plan.Plans": "计划",
  "plan.No plans": "暂无计划",
  "plan.Current start": "当前起始装备",
  "plan.Unresolved path": "未选择分歧",
  "plan.Equipment not acquired": "未获得装备",
  "plan.Assigned equipment occupied": "这件装备已被另一份计划使用",
  "plan.Assigned equipment changed": "这份计划使用的装备已经变化",
  "plan.Concrete equipment unavailable": "原来的装备当前不可用",
  "plan.Assigned": "已分配",
  "plan.Add": "新增",
  "plan.Current": "当前",
  "equipment.Has plan": "有计划",
  "equipment.Waiting for planning": "等待规划",
  "equipment.Waiting to acquire": "等待获得",
  "equipment.Plans": "相关计划",
  "equipment.No plans": "无计划",
  "equipment.Waiting for earlier plan": "等待前序计划",
  "equipment.Remove": "删除",
  "equipment.Target star": "目标星级",
  "equipment.Goal count": "目标数量",
  "equipment.Add plan": "添加计划",
  "equipment.Assigned equipment occupied": "这件装备已被另一份计划使用",
  "equipment.Assigned equipment changed": "这份计划使用的装备已经变化",
  "equipment.Concrete equipment unavailable": "原来的装备当前不可用",
  "app.Switch between Today and Equipment library": "切换今天改什么与装备库",
  "app.Use Today for executable work and Equipment library for equipment facts and plans.": "“今天改什么”用于执行当前步骤，“装备库”用于查装备事实、建立和管理该装备的计划。",
  "app.Filter by equipment text, category, Plan status, improvement facts, and sort order.": "可按装备文本、分类、计划状态和改修事实筛选，并调整排序。",
  "app.The interface focuses on Today and Equipment library, with planning, filters, material estimates, and upgrade routes in one workspace.": "界面围绕“今天改什么”和“装备库”组织，并集中提供计划、筛选、材料预估与升级路线。",
  "equipment.Assigned": "已分配",
  "equipment.No reachable start": "暂无可达起点",
  "equipment.Remove one plan": "删除一个计划",
  "workbench.Improvement starting point": "改修起点",
  "workbench.Plan target": "计划目标",
  "workbench.After upgrade %d": "第%d次升级后",
  "workbench.Later route to be decided": "升级路线待选择",
  "workbench.Improve to": "改修至",
  "workbench.Upgrade to": "升级为",
  "workbench.Remaining total consumption": "剩余总消耗",
  "workbench.Calculated from every unfinished segment in this plan route": "由这份计划路线中所有未完成阶段汇总",
  "workbench.Remaining total cost waits for the route to be complete": "后续路线确定后才能统计完整总消耗",
  "workbench.The confirmed part is shown above; total consumption will be available after the later route is decided.": "上方先显示已经确定的路线；后续路线确定后再给出完整剩余总消耗。",
  "workbench.Plan route and remaining consumption": "计划路线与剩余消耗",
  "workbench.Obtain the starting equipment before improvement": "改修前先获得起点装备",
  "workbench.The planned starting equipment is not in inventory yet; acquire it first, then continue this plan.": "计划使用的起点装备还没有入库；获得后即可继续这份计划。",
  "workbench.Bound equipment changed": "这份计划使用的装备发生了变化",
  "workbench.The bound equipment no longer matches the planned route": "这件装备现在无法继续这份计划",
  "workbench.The bound equipment instance is kept; the system will not silently switch to another item.": "仍使用原来的这件装备，不会自动更换",
  "workbench.The saved starting point no longer matches the improvement data": "已保存的改修起点不再符合现有改修数据",
  "workbench.Choose the improvement starting point": "选择改修起点",
  "workbench.Choose where this plan starts; equipment already passed in the route does not block Today.": "请选择这份计划从哪个装备开始；已经走过的上游装备不会阻塞“今天改什么”。",
  "workbench.Acquire starting equipment": "获得起点装备",
  "workbench.Finish the earlier plan first; this plan will not create an extra equipment copy automatically.": "请先处理前面的计划；这份计划不会自动假定多出一件装备。",
  "workbench.Plans waiting for starting point": "等待选择起点的计划",
  "equipment.Bound equipment route changed": "这件装备现在无法继续原计划路线",
  "shared.Improvement starting point": "改修起点",
  "shared.Choose an improvement starting point before this plan can enter Today": "选择改修起点后，这份计划才能进入“今天改什么”",
  "workbench.Choose a temporary improvement starting point": "选择临时改修起点",
  "workbench.Next improvement": "下一步改修",
  "workbench.Select a plan to choose its improvement starting point": "选择一个计划，为它确定改修起点",
  "workbench.Starting-point options come from live improvement routes and inventory; choose the one this plan should use": "这些起点都可以完成计划，请选择从哪里开始",
  "workbench.Selected plan": "当前计划",
  "workbench.The plan enters Today after its improvement starting point is decided": "确定改修起点后，这份计划就会进入“今天改什么”",
  "plan.Starting point pending": "请选择从哪里开始",
  "plan.Improvement starting point needs selection": "请选择从哪里开始",
  "plan.Improvement starting point is ready": "已经确定从这里开始",
  "plan.Preparing starting point options": "正在准备可选起点",
  "plan.The planner opens first, then prepares starting point options without blocking the main interface.": "先打开页面，再在后台准备可选起点，不阻塞主界面。",
  "plan.Choose improvement starting point": "选择改修起点",
  "plan.Starting point planning is not available for this equipment": "该装备不适用起点规划",
  "plan.No starting point option can reach this plan target": "目前找不到可以完成这个目标的起点",
  "plan.Starting equipment is occupied by another plan": "起点装备已被其他计划占用",
  "plan.No prerequisite starting point search is required": "无需选择其他起点",
  "plan.Choose the target star and quantity above. Starting point options will appear here immediately afterward.": "先在上方设置目标星级和数量，随后这里会显示可选起点。",
  "plan.Inventory already satisfies every configured goal, so no starting point is needed.": "库存已经满足全部计划目标，不需要再选择起点。",
  "plan.This equipment does not need starting-point search and is handled by its direct plan rules.": "这件装备可以直接作为起点，无需另外选择。",
  "plan.The target is still pending, but no valid starting point can be found from the current improvement data.": "目标尚未完成，但目前找不到可以完成这个目标的起点。",
  "plan.A matching equipment exists, but it is already bound to another plan. Resolve that conflict before creating another acquisition demand.": "已有符合条件的装备被另一份计划使用，请先处理那份计划。",
  "plan.The improvement route above determines the remaining improvement costs.": "上面的改修路线决定后续剩余消耗。",
  "plan.The starting point is ready. Open the planner to review the available options or choose another start.": "已经确定从这里开始，可以查看完整计划路线。",
  "plan.Open the planner to choose where this plan should start.": "打开起点选择，确定这份计划从哪里开始。",
  "plan.Starting point options": "可选起点",
  "plan.View plan route": "查看计划路线",
  "plan.Plan route details": "计划路线",
  "plan.Inventory starting point": "仓库已有",
  "plan.Acquisition starting point": "需要先获得",
  "plan.This route reaches": "升级后",
  "plan.Starting point option %d": "方案 %d",
  "plan.Planned route": "计划路线",
  "plan.Selected starting point": "从这里开始",
  "plan.Only starting point; selected automatically": "唯一可用起点，已自动采用",
  "plan.Keep this starting point": "继续从这里开始",
  "plan.Choose this starting point": "从这里开始",
  "plan.Later route choices will appear when this plan reaches that decision point.": "后续存在多个升级方案，到对应节点时再选择升级路线。",
  "plan.Choose where this plan should start": "请选择从哪里开始",
  "plan.Starting point selected": "从这里开始",
  "plan.Only one starting point option": "只有一个可用起点",
  "plan.The saved route no longer affects this plan; the starting point was refreshed from live inventory.": "库存发生变化，已重新确认这份计划的起点。",
  "plan.Choose the starting point this plan should use.": "请选择这份计划从哪里开始。",
  "plan.Inventory already satisfies every configured goal, so no additional consumption or shortage remains.": "库存已经满足全部计划目标，不再有新增消耗或缺口。",
  "plan.Starting point is still undecided": "起点尚未确定",
  "plan.Choose an improvement starting point before calculating this plan's remaining cost.": "先选择改修起点，再计算这份计划的剩余消耗。",
  "plan.Total consumption is unavailable for this plan": "暂时无法计算这份计划的总消耗",
  "plan.The plan is still pending, but the selected route cannot produce a complete cost projection.": "计划尚未完成，但所选路线目前无法生成完整的消耗统计。",
  "plan.Inventory covers the nominal total": "现有材料足够",
  "plan.Calculated from the equipment's present stars using the selected route": "从当前星级计算到计划目标",
  "plan.Starting equipment": "起点装备",
  "plan.In progress": "进行中",
  "equipment.Equipment improvement route": "本装备改修路线",
  "plan.Choose an improvement starting point before calculating the remaining cost for this plan.": "先选择改修起点，再计算这份计划的剩余消耗。",
  "plan.Calculated from present equipment stars using the selected route": "按装备当前星级与所选路线计算",
  "plan.Plan route": "计划路线",
  "plan.Selected plan": "当前计划",
  "plan.Starting point and plan target": "起点与计划目标",
  "plan.Improvement starting point": "改修起点",
  "plan.After equipment upgrade %d": "第 %d 次升级后",
  "plan.Later route to be decided": "升级路线待选择",
  "plan.Improve to": "改修至",
  "plan.Upgrade to": "升级为",
  "plan.Starting point applied automatically": "已经确定从这里开始",
  "plan.The starting point is already determined": "已经确定从这里开始",
  "plan.The only starting point is already applied; this route continues through the final plan target.": "已自动采用唯一可用起点，下方显示完整计划路线。",
  "plan.The final target is shown, but the later route still needs a decision.": "最终目标已确定，升级路线仍需选择。",
  "plan.Remaining total consumption waits for the route to be complete": "升级路线确定后才能统计完整消耗",
  "plan.The confirmed route is shown above; the full total appears after the later choice is made.": "先显示已确定的部分，选择升级路线后再统计全部消耗。",
  "plan.Improvement starting point is ready. Open the planner to review all conservative candidates or choose another start.": "已经确定从这里开始，可以查看完整计划路线。",
  "equipment.Clear all plans": "清空这件装备的所有计划",
  "equipment.Clear all plans confirmation": "确定清空这件装备的所有计划吗？",
  "equipment.Manage plan": "管理计划",
  "plan.Materials": "资材",
  "plan.Equipment consumables": "装备耗材",
  "plan.Material display filter": "材料显示",
  "plan.Warehouse available": "仓库已有",
  "plan.Need to acquire": "需要先获得",
  "plan.Only route; applied automatically": "唯一路线，已自动采用",
  "plan.Refresh plan route": "重新确认路线",
  "plan.Use this route": "使用这条路线",
  "plan.Compare the routes and their consumption, then choose the one you want to use.": "比较各条路线和消耗后，选择你想使用的一条。",
  "plan.Plans are shown in their original order": "按计划顺序显示",
  "plan.Route determined": "路线已确定",
  "plan.Upgrade route pending": "升级路线待选择",
  "plan.Select upgrade route": "选择升级路线",
  "plan.Delete this plan": "删除这份计划",
  "plan.Manage plans": "管理计划",
  "plan.Manage plan": "管理计划",
  "plan.Plan route determined": "计划路线已确定",
  "plan.Preparing plan routes": "正在准备计划路线",
  "plan.The window opens first, then prepares complete routes and their consumption.": "窗口会先打开，再加载完整路线和对应消耗。",
  "plan.Plan route management is not available for this equipment": "这件装备无需管理升级路线",
  "plan.No available route can reach this plan target": "目前没有可到达计划目标的路线",
  "plan.The required equipment is being used by another plan": "需要的装备正在被另一份计划使用",
  "plan.This plan can start from the target equipment itself": "这份计划可以直接从目标装备开始",
  "plan.Add a plan first to see routes from available starting equipment to the target.": "先添加计划，即可查看从可用起点到目标的路线。",
  "plan.The target is already satisfied by inventory.": "仓库已经满足这份计划的目标。",
  "plan.This equipment follows its direct plan rules and does not need route selection.": "这件装备可以直接按计划改修，不需要选择升级路线。",
  "plan.No route from the available improvement data can currently reach this target.": "按当前改修数据，暂时没有路线可以到达这个目标。",
  "plan.A matching equipment exists, but another plan is using it.": "有符合条件的装备，但正在被另一份计划使用。",
  "plan.Remaining improvement consumption is calculated directly from this equipment to the target.": "剩余改修消耗会直接从这件装备计算到计划目标。",
  "plan.Open plan management to review the selected route or choose another complete route.": "打开计划管理可查看已选路线，或改选其他完整路线。",
  "plan.Compare the complete routes and their consumption, then choose one for this plan.": "比较完整路线和对应消耗后，为这份计划选择一条。",
  "workbench.Plans waiting for upgrade route": "等待选择升级路线的计划",
  "workbench.The selected upgrade route no longer matches the improvement data": "已选升级路线不再符合现有改修数据",
  "workbench.Choose an upgrade route": "选择升级路线",
  "workbench.Compare the complete routes and their consumption, then choose the route this plan should use.": "比较完整路线和消耗，然后选择这份计划要使用的路线。",
  "plan.Upgrade route is still undecided": "升级路线待选择",
  "plan.Choose an upgrade route before calculating the remaining cost for this plan.": "选择升级路线后，再计算这份计划的剩余改修消耗。",
  "plan.Acquisition methods": "获取途径",
  "plan.View details": "查看详情",
  "plan.How to obtain %s": "如何获得 %s",
  "plan.Ship initial equipment": "初始装备",
  "plan.Ship remodel at Lv.%d": "Lv.%d 舰娘改造获得",
  "equipment.Occupied": "被占用",
  "equipment.Status changed": "状态变化",
  "shared.Customize detail panel": "管理详情区域",
  "shared.Move up": "上移",
  "shared.Drag to reorder": "拖动调整顺序",
  "shared.Move down": "下移",
  "shared.Restore default": "恢复默认",
  "shared.Apply": "应用",
  "app.Help & updates": "帮助与更新",
  "app.Guide": "使用帮助",
  "app.Quick start": "快速开始",
  "app.Plan in Equipment library, resolve only real route choices, then use Today as the execution view.": "先在装备库设置计划，只在确有多条路线时做选择，再用“今天改什么”执行。",
  "app.1. Add a plan in Equipment library": "1. 在装备库添加计划",
  "app.Choose equipment, target stars, and quantity. Plans stay explicit and can be managed per equipment.": "选择装备、目标星级和数量；计划保持明确，并可按装备逐项管理。",
  "app.2. Resolve route choices only when needed": "2. 只有真正存在分歧时才选路线",
  "app.If more than one complete route is valid, choose the route yourself. Missing equipment can show where to acquire it.": "存在多条完整可行路线时由你自己选择；缺少起点装备时可以查看获取途径。",
  "app.3. Execute from Today": "3. 在“今天改什么”执行",
  "app.Today shows the next plan work with its current equipment, assistant ship, available days, materials, and remaining route.": "“今天改什么”会显示计划当前要处理的装备、秘书舰、可改日期、材料和剩余路线。",
  "app.Core workflow": "核心流程",
  "app.Today is the action list": "“今天改什么”是执行清单",
  "app.Use the left list to choose what to work on. The right side explains the current equipment, route, materials, and conditions.": "用左侧清单选择要处理的项目，右侧查看当前装备、路线、材料和条件。",
  "app.Equipment library is the planning workspace": "装备库是计划工作区",
  "app.Search equipment, review owned copies, add or clear plans, compare total cost, and manage each plan route.": "搜索装备、查看库存、添加或清空计划、比较总消耗，并管理每份计划的路线。",
  "app.Route choices stay explicit": "路线分歧始终明确",
  "app.A single valid route is used directly. Multiple valid complete routes remain waiting for your choice instead of being auto-ranked.": "只有一条合法路线时直接采用；存在多条完整合法路线时保持待选，不会自动替你排出“最佳路线”。",
  "app.Acquisition sources explain missing equipment": "缺少装备时可查看获取途径",
  "app.When a route starts from equipment you do not own, open acquisition details to review development, quest, or ship sources.": "路线需要尚未持有的装备时，可打开获取详情查看开发、任务或舰娘初始／改造来源。",
  "app.Expected and guaranteed material views": "期望与确保材料视图",
  "app.Compare resource and material needs without changing route identity. Development materials and improvement materials can be shown separately.": "比较不同材料需求不会改变路线本身；开发资材与改修资材可独立显示或隐藏。",
  "app.Personalize detail panels": "自定义详情区域",
  "app.Use Manage detail sections to show, hide, and reorder ordinary detail areas. Required action sections always stay visible.": "通过“管理详情区域”显示、隐藏并调整普通详情区顺序；需要处理的关键区域始终保持可见。",
  "app.Common tools": "常用工具",
  "app.Low-priority equipment only affects recommendation order; it does not remove equipment from plans or route calculations.": "低优先装备只影响推荐排序，不会把装备从计划或路线计算中移除。",
  "app.Data import and export are available from Data.": "可从“数据”中导入或导出插件数据。",
  "app.Density changes spacing and text size without changing the planning result.": "界面密度只调整间距和字号，不改变计划计算结果。",
  "app.This guide opens automatically only once for each guide revision. You can reopen it from Help at any time.": "每次帮助内容大版本更新后只会自动打开一次，之后可随时从“帮助”重新打开。",
  "app.Recent user-visible changes": "近期用户可见更新",
  "app.Only product changes that matter to normal use are kept here; development and release-operation history is omitted.": "这里只保留影响正常使用的产品变化，开发过程和发布操作记录不会显示在这里。",
  "app.No release notes yet": "暂无更新日志",
  "app.No user-visible release notes are available for this build.": "这个版本暂无需要展示给用户的更新记录。",
  "workbench.This requirement is managed automatically by its parent plan": "这项获取需求由上级计划自动管理",
  "workbench.Sources are shown without creating a separate route choice": "这里只查看获取来源，不会另外创建路线选择",
  "workbench.Choose acquisition or improvement route": "选择获取 / 改修路线",
  "plan.Return to routes": "返回路线",
  "app.Today guide": "今天改什么指南",
  "app.Review the main areas in Today and what each area is used for.": "介绍“今天改什么”页面的主要区域，以及每个区域的用途。",
  "app.Sort and search: search equipment and organize the list by status, date, or improvement ability.": "排序搜索：搜索装备，并按状态、日期、改修能力等进行整理。",
  "app.Plan list: review work that can be advanced today and items still waiting for planning or acquisition.": "列表区域：查看今天可推进的内容，以及仍在等待规划或等待获得的条目。",
  "app.Waiting for planning: if a row is waiting for planning, open the route planner before execution.": "等待升级路线规划：如果条目标记为待规划，请先进入路线规划再执行。",
  "app.Top-right tools: switch pages and open Help.": "右上角功能按钮：切换页面并打开帮助。",
  "app.Plan detail: review the current target, stages, assistant ship, available days, and costs.": "单个具体计划：查看当前目标、阶段、秘书舰、可改日期和消耗。",
  "app.Material source details: hover to preview a source summary and click to open the full source detail.": "装备耗材来源详情：悬停可预览来源摘要，点击可打开完整来源详情。",
  "app.Manage detail sections: show, hide, or reorder ordinary detail areas.": "管理详情区域：可显示、隐藏或调整普通详情区域的顺序。",
  "app.Equipment library guide": "装备库指南",
  "app.Use search, sorting, and categories to find equipment before creating or managing plans.": "通过搜索、排序和分类来查找装备，再创建或管理计划。",
  "app.Search box: quickly find equipment by name.": "搜索框：按装备名快速查找目标装备。",
  "app.Sort and filters: organize the list by plan state, improvement ability, available day, and more.": "排序与筛选：按计划状态、改修能力、可改日等整理列表。",
  "app.Equipment categories: switch between main guns, aircraft, and other equipment groups.": "装备分类：按主炮、舰载机等类型快速切换查看。",
  "app.Equipment list: select one equipment entry to inspect details and manage plans.": "装备列表：选中一件装备后查看详情并管理计划。",
  "app.Manage low-priority recommendations and batch operations for equipment you do not want to prioritize.": "管理低优先装备的推荐项和批量操作。",
  "app.Sort order: change how the low-priority list is displayed.": "排序方式：调整低优先装备列表的显示顺序。",
  "app.Equipment type: filter the low-priority list by equipment type.": "装备类型：按类型筛选低优先装备。",
  "app.View recommendations: review equipment the system recommends adding to low priority.": "查看推荐：查看系统推荐加入低优先的装备。",
  "app.Add low-priority equipment: add the selected equipment to the low-priority list.": "添加低优先装备：把选中的装备加入低优先列表。",
  "app.Remove low-priority equipment: remove the selected equipment from the low-priority list.": "移出低优先装备：把选中的装备从低优先列表中移除。",
  "app.Select all / selected count: make batch selection and operations easier.": "全选 / 已选择：方便批量勾选和操作。",
  "app.Close: leave the current window.": "关闭：退出当前窗口。",
  "app.Material source detail guide": "装备耗材来源详情指南",
  "app.Open a material item to review how to obtain it and what route step needs it next.": "打开装备耗材条目后，可查看获取方式以及后续会在哪一步使用。",
  "app.Title area: confirms which equipment source detail is currently open.": "标题区域：确认当前查看的是哪件装备的来源详情。",
  "app.Source list: review development, initial-ship equipment, remodel, and other acquisition methods.": "来源列表：查看开发、舰娘初始装备、改造等获取方式。",
  "app.Next improvement step: see where this equipment will be used next.": "下一步改修：查看这件装备下一步会用在什么地方。",
  "app.Assistant ship: review the assistant ship requirement for the next step.": "秘书舰：查看下一步改修所需的秘书舰。",
  "app.Available days: confirm when the next improvement can be performed.": "可改日期：确认下一步什么时候可以继续改修。",
  "app.Plan management guide": "管理计划指南",
  "app.Switch plans, inspect routes, and filter material rows while managing routes.": "在管理计划时切换计划、查看路线，并按材料类型过滤表格。",
  "app.Plan list: switch between plans on the left to inspect different routes.": "计划列表：在左侧切换不同计划，查看各自的路线内容。",
  "app.Current plan: the middle area shows the selected plan, its route, and current material statistics.": "当前计划：中间区域显示当前选中计划的路线、目标和材料统计。",
  "app.Material filter: toggle fuel, ammo, steel, bauxite, dev mats, improvement mats, and equipment materials. Hidden types disappear from the table below.": "材料过滤：可切换燃料、弹药、钢材、铝土、开发资材、改修资材和装备耗材。关闭后，下方表格中对应行会隐藏。",
  "app.Route content: confirm the start, route stages, and final target for the selected route.": "路线内容：确认所选路线的起点、阶段目标和最终目标。",
  "app.Route actions: use the displayed route or open detail confirmation.": "路线操作：可直接使用这条路线，或打开详情进一步确认。",
  "app.Material statistics: compare consumption and shortages across route cost profiles. Only enabled material types are shown.": "材料统计：比较不同方案下的消耗和缺口；只有已开启的材料类型会显示。",
  "app.Delete all plans: the top-right button clears every plan for the current equipment. Use it carefully.": "删除全部计划：右上角按钮会清空当前这件装备的所有计划，请谨慎使用。",
  "workbench.Route selection is handled in plan management": "路线选择请在计划管理中处理",
  "app.Unknown": "未知",
  "app.Data version %s": "最新数据版本 %s",
  "app.Data updated %s": "最新数据更新时间 %s",
  "app.changelog_1_2_2_equipment_library_fix": "修复装备库相关问题，打开和切换装备详情时更稳定。",
  "app.changelog_1_2_1_equipment_detail_consumable_fix": "修复打开包含消耗品的改修阶段详情时，因详情面板未接收到道具库存与资源数据而可能报错的问题。",
  "app.changelog_1_2_0_goal_and_inventory": "按目标装备、目标星级和数量创建计划，并结合当前真实库存自动判断每个计划的实际起点。",
  "app.changelog_1_2_0_routes_and_acquisition": "支持完整改修路线；存在多条可行路线时由你选择，缺少的中间装备会自动纳入需求，并可查看开发、任务、舰娘初始／改造、改修更新等获取方式。",
  "app.changelog_1_2_0_today": "“今天改什么”会结合计划、库存、星期和秘书舰，集中展示今天可推进的内容、剩余步骤、材料和路线成本。",
  "app.changelog_1_2_0_equipment_workspace": "装备库支持搜索、分类、计划状态筛选和计划管理；同时提供低优先装备与详情区域自定义。",
  "app.changelog_1_2_0_backup": "支持计划、路线选择和界面设置等数据的备份与恢复。",
  "app.changelog_1_2_0_help_and_data": "内置图文帮助，并显示当前数据版本和更新时间；界面与帮助语言对接 Poi 的 i18n 设置。",
  "app.Data package updated, refreshing decision chain...": "数据包已更新，正在刷新决策链路…",
  "app.changelog_1_2_3_runtime_data_auto_update_fix": "修复数据包无法按预期自动更新的问题。",
  "app.Diagnostics": "诊断",
  "diagnostics.Check stable state": "检查配置",
  "diagnostics.Stable state validation": "配置健康检查",
  "diagnostics.Stable state is consistent": "当前稳定态一致。",
  "diagnostics.Stable state has %s issue(s)": "当前稳定态发现 %s 个问题。",
  "diagnostics.Stable state validation could not run": "无法执行稳定态检测。",
  "diagnostics.Checks Plan, Route, concrete api_id ownership, Snapshot projection, and migration recovery invariants without changing state.": "检查计划、路线、装备绑定和迁移状态是否一致，不修改任何用户数据。",
  "diagnostics.All known plugin-owned Poi config keys, including compatibility keys": "本插件全部已知 Poi 配置项（含兼容键）",
  "diagnostics.Caches cleared. Restarting plugin...": "缓存已清理，正在重启插件…",
  "diagnostics.Caches could not be cleared": "无法清理缓存。",
  "diagnostics.Cancel": "取消",
  "diagnostics.Choose save location": "选择保存位置",
  "diagnostics.Clear all caches and restart plugin": "清理运行缓存并重启插件",
  "diagnostics.Clear caches and restart": "清理缓存并重启",
  "diagnostics.Clearing caches...": "正在清理缓存…",
  "diagnostics.Close": "关闭",
  "diagnostics.Confirm clear and restart": "确认清理并重启",
  "diagnostics.Current effective equipment inventory used by the plugin": "插件当前实际使用的装备库存",
  "diagnostics.Current effective resources used by the plugin": "插件当前实际使用的基础资源库存",
  "diagnostics.Current effective ship inventory used by the plugin": "插件当前实际使用的舰船库存",
  "diagnostics.Current effective useitem inventory used by the plugin": "插件当前实际使用的道具库存",
  "diagnostics.Current persisted improvement-cost cache": "当前持久化改修成本缓存",
  "diagnostics.Diagnostic bundle exported": "诊断包已导出。",
  "diagnostics.Diagnostic bundle manifest": "诊断包文件清单",
  "diagnostics.Diagnostic bundle saved as %s": "诊断包已保存为 %s",
  "diagnostics.Export diagnostic bundle": "导出诊断包",
  "diagnostics.Exports the inventory and all plugin configuration needed to reproduce a problem.": "导出用于复现问题的库存数据和全部插件配置。",
  "diagnostics.Files included": "诊断数据范围",
  "diagnostics.Improvement-cost cache metadata": "改修成本缓存信息",
  "diagnostics.Persisted personal profile when present": "已保存的个人资料（存在时）",
  "diagnostics.Plugin-owned renderer localStorage values such as modal bounds": "本插件的本地界面配置，例如弹窗尺寸",
  "diagnostics.Plugin/runtime/data-package identity used for reproduction": "用于复现的插件、运行环境和数据包身份",
  "diagnostics.Previous persisted improvement-cost cache": "上一份持久化改修成本缓存",
  "diagnostics.Problem diagnostics": "恢复与诊断",
  "diagnostics.Runtime data package status and cache metadata": "运行时数据包状态与缓存信息",
  "diagnostics.Small Poi host config subset consumed by this plugin": "本插件读取的少量 Poi 宿主配置",
  "diagnostics.The bundle contains inventory and plugin settings. Review it before sharing.": "诊断包包含库存数据和插件设置，分享前请确认内容。",
  "diagnostics.The diagnostic bundle could not be exported": "无法导出诊断包。",
  "diagnostics.Canonical plugin backup with plans, route choices, assignments, blacklist, and UI preferences": "插件标准备份，包含计划、路线选择、装备分配、低优先装备和界面设置",
  "equipment.Upgrade chain terminal": "改修终点",
  "equipment.Improvement route": "改修路线",
  "equipment.Improvement endpoint": "改修终点",
  "app.changelog_1_2_3_equipment_planning_ui": "优化“今天改什么”和装备库的计划与持有装备信息显示，改进改修路线筛选，并记住搜索与排序。",
  "app.changelog_1_2_3_problem_diagnostics": "新增问题诊断，可先清理缓存并重载插件；问题仍存在时可导出诊断数据。",
  "app.changelog_1_2_3_host_compatibility_and_stability": "提升 Poi 12 / React 18 兼容性并修复若干潜在问题。",
  "diagnostics.Exports plugin diagnostic data and the personal inventory data stored by Poi under Local Storage/leveldb.": "导出用于排查问题的插件数据，以及 Poi 保存的个人库存数据。",
  "diagnostics.Plugin diagnostic data file": "插件数据",
  "diagnostics.Poi personal inventory data file": "Poi 个人库存数据",
  "diagnostics.Some Poi personal inventory files were in use and could not be copied. The skipped files are listed in manifest.json.": "部分 Poi 个人库存文件正在被占用，未能复制；诊断包已保存，跳过的文件记录在 manifest.json 中。",
  "bootstrap.Plugin State is damaged. Automatic legacy fallback is disabled to protect newer plans.": "插件状态已损坏。为保护迁移后的新计划，不会自动回退旧配置。",
  "bootstrap.Restore migration-time configuration only if you accept losing changes made after migration.": "只有在接受丢失迁移后新增或修改内容时，才从迁移时配置恢复。",
  "bootstrap.Restore migration-time configuration": "从迁移时配置恢复",
  "app.changelog_1_2_4_assignment_waiting_fix": "修复大量计划下匹配库存用完后的装备分配异常，以及可能卡死的问题。",
  "app.changelog_1_2_4_state_migration_recovery": "增加异常恢复功能，可在异常时清理可重建缓存并重启插件；同时增加配置健康检查与诊断数据导出。",
  "app.changelog_1_2_4_cache_diagnostics_stability": "改进缓存清理和问题诊断，同时保留健康的已下载数据与玩家配置。",
  "diagnostics.Clears derived caches, then reloads this plugin window. Plans, downloaded runtime data, inventory profiles, and settings are preserved.": "用于插件状态异常时恢复。只清理可重新生成的运行缓存并重启插件，不会删除计划、路线选择、装备绑定、低优先装备等用户配置。",
  "bootstrap.Updating plugin data": "正在更新插件数据",
  "bootstrap.Plans and equipment assignments are being migrated and verified.": "正在迁移并校验计划与装备分配数据。",
  "bootstrap.Please do not close Poi, disable, or restart the plugin until this finishes.": "请暂时不要关闭 Poi、禁用或重启插件。",
  "bootstrap.The plugin will continue automatically after the new data is reloaded successfully.": "新数据重新载入并校验成功后将自动继续。",
  "bootstrap.Data update is still running. Continue waiting is recommended.": "数据更新仍在进行，建议继续等待。",
  "bootstrap.Close anyway": "仍然关闭",
  "bootstrap.Continue waiting": "继续等待",
  "bootstrap.Confirm interrupting the data update?": "确定要中断数据更新吗？",
  "bootstrap.Return and wait": "返回等待",
  "bootstrap.Confirm close Poi": "确认关闭 Poi",
  "diagnostics.Recovery and diagnostics": "恢复与诊断",
  "diagnostics.Clear runtime caches and restart plugin": "清理运行缓存并重启插件",
  "diagnostics.Configuration health check": "配置健康检查",
  "diagnostics.Check configuration": "检查配置",
  "diagnostics.Checks Plans, routes, equipment bindings, and migration state without changing user data.": "检查计划、路线、装备绑定和迁移状态是否一致，不修改任何用户数据。",
  "diagnostics.Diagnostic data scope": "诊断数据范围",
  "diagnostics.Plugin diagnostic data": "插件数据",
  "diagnostics.Poi personal inventory data": "Poi 个人库存数据",
  "diagnostics.Exports plugin data used for troubleshooting and the personal inventory data stored by Poi.": "导出用于排查问题的插件数据，以及 Poi 保存的个人库存数据。",
  "workbench.None": "无",
  "workbench.Primary sort": "第一排序",
  "workbench.Secondary sort": "第二排序",
  "workbench.Consumable plans last": "耗材计划排在最后",
  "workbench.Plan type": "计划类型",
  "workbench.All plans": "全部计划",
  "workbench.User plans": "用户计划",
  "workbench.Consumable plans": "耗材计划",
  "workbench.Action type": "行动类型",
  "workbench.All actions": "全部",
  "workbench.Improvement": "改修",
  "workbench.Acquire first": "先获取",
  "data.Configuration and backups": "配置与备份",
  "data.Export configuration": "导出配置",
  "data.Export user Plans, route choices, low-priority choices, and interface settings; equipment bindings and caches are not included": "导出用户计划、路线选择、低优先装备选择和界面设置；不包含装备分配与缓存。",
  "data.Import configuration": "导入配置",
  "data.Import replaces user configuration, creates an automatic backup first, and rebuilds equipment bindings": "导入会替换用户配置，执行前自动创建备份，并重新生成装备分配。",
  "data.Choose configuration file": "选择配置文件",
  "data.Working": "处理中…",
  "data.Automatic backups": "自动备份",
  "data.Backups keep user Plans, route choices, low-priority choices, and interface settings; derived bindings and caches are rebuilt": "备份保存用户计划、路线选择、低优先装备选择和界面设置；装备分配与缓存会重新生成。",
  "data.No automatic backups yet": "暂无自动备份。",
  "data.Restore backup": "恢复",
  "data.Delete backup": "删除",
  "data.Restore backup confirmation": "即将恢复 %s 的备份。恢复前会先备份当前状态，是否继续？",
  "data.Delete backup confirmation": "确认删除 %s 的备份？",
  "data.Backup reason %s": "原因：%s",
  "data.Before configuration import": "导入配置前",
  "data.Before backup restore": "恢复备份前",
  "data.Manual backup": "手动备份",
  "data.Import configuration summary %p plans %r routes %l low priority %d settings": "计划：%p · 路线：%r · 低优先装备：%l · 设置：%d",
  "data.Legacy backup detected; equipment bindings will be rebuilt": "检测到旧版完整备份；装备分配将重新生成。",
  "data.Older settings-only configuration detected; current Plans and route choices will be kept": "检测到旧版仅设置配置；当前计划和路线选择将保留。",
  "data.The selected file does not contain valid configuration data": "所选文件不包含有效的配置数据。",
  "data.This configuration belongs to another plugin": "此配置属于其他插件。",
  "data.This configuration format is not supported by this version": "当前版本不支持此配置格式。",
  "data.The configuration file could not be exported": "配置文件导出失败。",
  "data.The backup file is not valid JSON": "备份文件不是有效的 JSON。",
  "data.The backup file is invalid": "备份文件无效。",
  "data.The backup timestamp is invalid": "备份时间戳无效。",
  "data.The backup could not be restored": "备份恢复失败。",
  "data.The backup could not be deleted": "备份删除失败。",
  "app.changelog_1_2_5_1": "新增界面偏好保存，部分页面的排序与筛选设置可在重启后保留。",
  "app.changelog_1_2_5_2": "新增配置导入、导出功能。",
  "app.changelog_1_2_5_3": "导入配置前会自动创建本地备份，并支持从备份恢复。",
  "app.changelog_1_2_5_4": "优化插件重复打开时的加载速度。",
  "app.changelog_1_2_5_5": "装备搜索支持多语言搜索。",
  "app.changelog_1_2_5_6": "优化部分界面的配置与显示一致性。",
  "app.changelog_1_2_5_7": "修复部分界面与数据处理问题。",
  "data.Backup summary %p plans %r routes %l low priority": "计划 %p · 路线 %r · 低优先装备 %l",
  "equipment.Search equipment name": "搜索装备名称",
  "workbench.Search equipment name": "搜索装备名称",
  "app.changelog_1_2_6_1": "优化计划计算与启动速度。",
  "app.changelog_1_2_6_2": "修复极端情况下计划数量和装备分配异常的问题。",
  "shared.Show parent plans": "显示父计划",
  "app.changelog_1_2_6_3": "优化相关计划与耗材计划的显示，提高可读性。",
  "app.Statistics": "统计",
  "statistics.Statistics": "统计",
  "statistics.Overview": "总览",
  "statistics.Planned equipment": "计划装备",
  "statistics.Equipment types with user plans": "存在用户计划的装备种类",
  "statistics.Remaining plans": "未完成计划",
  "statistics.Unfinished user plan copies": "仍未完成的用户计划份数",
  "statistics.Completed plans": "已完成计划",
  "statistics.Completed user plan copies": "已完成的用户计划份数",
  "statistics.Consumable gaps": "耗材缺口",
  "statistics.Consumable copies still to acquire": "仍需获取的装备耗材数量",
  "statistics.Review current plan targets, equipment needs, and consumable gaps.": "汇总查看当前计划目标、装备需求和耗材缺口。",
  "statistics.Statistics views": "统计视图",
  "statistics.Equipment requirements": "装备需求",
  "statistics.User plans": "用户计划",
  "statistics.Equipment": "装备",
  "statistics.Owned": "仓库持有",
  "statistics.User plan gap": "用户计划缺口",
  "statistics.Consumable gap": "耗材缺口",
  "statistics.Open needs": "待处理需求",
  "statistics.No current equipment requirements": "当前没有装备需求",
  "statistics.Plan targets": "计划目标",
  "statistics.Completed": "已完成",
  "statistics.Remaining": "未完成",
  "statistics.No user plans": "当前没有用户计划",
  "statistics.Acquisition gap": "获取缺口",
  "statistics.Source plans": "来源计划",
  "statistics.No consumable acquisition gaps": "当前没有耗材获取缺口",
  "statistics.Analysis tools": "分析工具",
  "statistics.Resource requirements": "资源需求",
  "statistics.Review current plan targets, equipment needs, consumable gaps, and projected costs.": "汇总查看当前计划目标、装备需求、耗材缺口与成本投影。",
  "statistics.Cost basis: minimum improvement materials": "成本口径：最少改修资材",
  "statistics.For each remaining improvement step, compare normal expected improvement-material consumption with guaranteed fixed consumption and use the lower-improvement-material option.": "对每个剩余改修步骤，比较普通改修的期望改修资材消耗与确保改修的固定消耗，并采用改修资材更少的一方。",
  "statistics.Probability semantics": "概率口径",
  "statistics.Normal is an expected value based on the estimated Akashi Kai success rate, not a guaranteed stock requirement. Guaranteed is the fixed successful-improvement cost.": "普通方案是基于明石改估算成功率得到的期望值，不代表保证足够的备货量；确保方案采用确保成功的固定消耗。",
  "statistics.Equipment semantics": "装备口径",
  "statistics.Base equipment demand stays deterministic in Equipment requirements. Equipment shown below is consumed material only, after reserving selected zero-star starting equipment.": "本体装备需求仍按“装备需求”中的确定性缺口统计。下表只统计作为耗材消耗的装备，并先预留已选定的★0起始装备。",
  "statistics.Projected plan copies: %d; not yet projectable: %u": "已投影计划份数：%d；暂无法投影：%u",
  "statistics.Core resource requirements": "核心资源需求",
  "statistics.Resource": "资源",
  "statistics.Minimum improvement materials": "最少改修资材",
  "statistics.Gap": "缺口",
  "statistics.Normal expected": "普通期望",
  "statistics.Guaranteed": "确保",
  "statistics.Fuel": "燃料",
  "statistics.Ammo": "弹药",
  "statistics.Steel": "钢材",
  "statistics.Bauxite": "铝土",
  "statistics.Development materials": "开发资材",
  "statistics.Improvement materials": "改修资材",
  "statistics.Current resource inventory is unavailable, so resource gaps are not calculated.": "当前资源库存不可用，因此暂不计算资源缺口。",
  "statistics.Equipment consumable requirements": "装备耗材需求",
  "statistics.Available / owned": "可用 / 持有",
  "statistics.Reserved as bases: %d": "作为本体预留：%d",
  "statistics.No equipment consumables in the current cost projection": "当前成本投影中没有装备耗材",
  "statistics.No resolved User Plan route is available for cost projection yet.": "当前还没有可用于成本投影的已确定用户计划路线。",
  "statistics.Consumable plans": "耗材计划",
  "statistics.Resource gaps": "资源缺口",
  "statistics.Improvement success rates": "改修成功率",
  "statistics.User plans and consumable plans are kept separate here so you can see what you chose and what the plans additionally consume without mixing the two.": "用户计划和耗材计划分开统计：前者只看你主动设置的目标，后者只看这些计划额外产生的耗材需求，避免混在一起。",
  "statistics.Resource gaps can be viewed in three ways: minimum improvement materials chooses the lower-screw option step by step; normal estimates repeated attempts from the success rate; guaranteed uses the fixed guaranteed-success cost.": "资源缺口有三种统计方案：最少改修资材会逐步选择更省螺丝的做法；普通按成功率估算重复尝试后的期望消耗；确保按确保成功的固定消耗统计。",
  "statistics.Base equipment demand is a fixed count. Consumable demand is an expected amount under normal steps, so it may be fractional and does not mean that preparing exactly that amount guarantees completion.": "装备本体需求是确定值。耗材在普通改修步骤中按期望消耗统计，所以可能出现小数，也不代表准备到这个数量就一定能完成。",
  "statistics.Statistics plan": "统计方案",
  "statistics.Normal": "普通",
  "statistics.Core resource gaps": "核心资源缺口",
  "statistics.Equipment statistics": "装备统计",
  "statistics.Base equipment demand": "装备本体需求",
  "statistics.Consumable demand": "耗材需求",
  "statistics.Total": "总计",
  "statistics.No equipment requirements in the current cost projection": "当前统计方案下没有装备需求",
  "statistics.Minimum improvement materials mixes normal and guaranteed steps, choosing whichever uses fewer improvement materials at each step.": "最少改修资材会在每一步比较普通与确保，选择改修资材消耗更少的一种。",
  "statistics.Normal uses estimated Akashi Kai success rates, so resource and consumable values are expected consumption rather than guaranteed stock amounts.": "普通方案按明石改的估算成功率计算，资源和耗材显示的是期望消耗，不是保证足够的备货量。",
  "statistics.Guaranteed uses the fixed cost of guaranteed-success improvement whenever that route provides it.": "确保方案按确保成功时的固定消耗统计。",
  "statistics.Improvement success rates are estimates used by the normal expected-cost calculation.": "这里列出普通方案计算期望消耗时使用的估算改修成功率。",
  "statistics.Improvement stage": "改修阶段",
  "statistics.Akashi": "明石",
  "statistics.Akashi Kai": "明石改",
  "statistics.Conversion": "更新/转换",
  "app.changelog_1_2_7_statistics": "新增统计界面。",
  "app.changelog_1_2_7_remaining_cost_fix": "修复部分已经开始执行的改修计划，其剩余资源、开发资材、改修资材及装备耗材可能错误显示为 0 的问题。",
  "statistics.Current": "持有",
  "statistics.Equipment gaps": "装备缺口",
  "chain.Open the complete chain to pan and zoom": "打开完整升级链后可拖动和缩放查看。",
  "app.Equipment allocation": "装备分配",
  "app.Adjustable %d": "可调整 %d",
  "app.Available adjustments": "可操作调整",
  "app.Only strict progress on the current route is suggested. Nothing changes until you confirm.": "这里只显示所选路线中已经推进得更远的可用装备；确认前不会实际调整装备分配。",
  "app.No allocation adjustments are currently available": "当前没有可调整的装备分配",
  "app.Confirming...": "正在确认…",
  "app.Confirm adjustment": "确认调整",
  "app.History": "历史",
  "app.History is read-only and cannot be rolled back or reapplied.": "历史仅供查看，不支持回滚或重新执行。",
  "app.No allocation adjustment history yet": "暂无装备分配调整历史",
  "app.This adjustment is no longer available. The current allocation has been refreshed.": "这条调整已经失效，当前装备分配已刷新。",
  "app.Allocation adjusted": "装备分配已调整",
  "plan.Equipment allocation": "装备分配",
  "plan.Adjustable %d": "可调整 %d",
  "plan.Available adjustments": "可操作调整",
  "plan.Only strict progress on the current route is suggested. Nothing changes until you confirm.": "这里只显示所选路线中已经推进得更远的可用装备；确认前不会实际调整装备分配。",
  "plan.No allocation adjustments are currently available": "当前没有可调整的装备分配",
  "plan.Confirming...": "正在确认…",
  "plan.Confirm adjustment": "确认调整",
  "plan.History": "历史",
  "plan.History is read-only and cannot be rolled back or reapplied.": "历史仅供查看，不支持回滚或重新执行。",
  "plan.No allocation adjustment history yet": "暂无装备分配调整历史",
  "plan.This adjustment is no longer available. The current allocation has been refreshed.": "这条调整已经失效，当前装备分配已刷新。",
  "plan.Allocation adjusted": "装备分配已调整",
  "app.Allocation recommendations": "分配建议",
  "app.A recommendation is shown only when an available item is further along the selected route. Your allocation changes only after you apply it.": "仅当所选路线存在推进得更远的可用装备时才会给出推荐；只有应用推荐后才会更新当前装备分配。",
  "app.Applying...": "正在应用…",
  "app.This recommendation is no longer available. The current allocation has been refreshed.": "这条推荐已经失效，当前装备分配已刷新。",
  "app.Allocation updated": "装备分配已更新",
  "app.changelog_1_2_8_allocation_recommendations": "新增装备分配建议：当计划起点有更进一步的可用选择时会进行提醒，确认后即可更新装备分配。",
  "app.changelog_1_2_8_recommendation_history": "新增装备分配更新记录，并在有待确认的分配建议时提供更明显的提示。",
  "plan.Allocation recommendations": "分配建议",
  "plan.Applying...": "正在应用…",
  "app.Allocation recommendations available": "有分配建议",
  "plan.There are %d allocation recommendations. Confirm to update the allocation.": "有 %d 项分配建议，确认后才会更新装备分配。",
  "plan.A recommendation appears when a more advanced starting item is available on the selected route. The allocation changes only after you confirm the update.": "当计划起点有沿所选路线更进一步的可用装备时会给出建议，确认后才会更新分配。",
  "plan.Update allocation": "更新分配",
  "plan.Updating...": "更新中…",
  "plan.Update records": "更新记录",
  "plan.Update records show successful allocation changes only and are read-only.": "这里只记录已成功更新的装备分配，仅供查看。",
  "plan.No allocation update records yet": "暂无更新记录",
  "plan.No allocation recommendations available": "当前没有分配建议",
  "app.Set low-priority equipment, build plans in Equipment library, choose routes, execute from Today, then review overall gaps in Statistics.": "先设置低优先装备，再在装备库建立计划、选择路线，之后从“今天改什么”执行，并在统计中查看整体缺口。",
  "app.1. Set low-priority equipment": "1. 设置低优先装备",
  "app.Mark equipment that should be consumed or occupied later than normal. Low priority changes ordering, not legality.": "把希望更晚消耗或占用的装备标为低优先。低优先只改变顺序，不改变合法性。",
  "app.2. Build plans in Equipment library": "2. 在装备库建立计划",
  "app.Find the equipment you want, create explicit plans, and review owned copies, targets, stages, and total cost.": "找到目标装备并建立明确计划，同时查看持有数量、目标、阶段和总消耗。",
  "app.3. Choose routes when there is a real choice": "3. 真有分歧时再选择路线",
  "app.Compare complete legal routes and their material structure. The plugin does not silently replace your route decision.": "比较完整合法路线及其材料结构；插件不会静默替换你的路线决定。",
  "app.4. Execute from Today": "4. 从“今天改什么”执行",
  "app.After plans and routes are ready, use Today for the current assistant ship, available days, materials, and next action.": "计划和路线准备好后，在“今天改什么”查看当前秘书舰、可改日期、材料和下一步操作。",
  "app.5. Review overall gaps in Statistics": "5. 在统计中查看整体缺口",
  "app.Use Statistics to inspect the overall plan and resource gaps. Statistics is read-only and does not change plans.": "用统计查看整体计划和资源缺口。统计是只读视图，不会改变计划。",
  "app.Equipment library defines what you want to build": "装备库负责定义你想做什么",
  "app.Search equipment, create and manage plans, inspect current ownership, and enter route management from one workspace.": "在一个工作区里搜索装备、建立和管理计划、查看当前持有，并进入路线管理。",
  "app.Route selection stays explicit": "路线选择始终由用户明确决定",
  "app.When multiple complete legal routes exist, compare them and choose one. Cost comparison is evidence, not an automatic best-route decision.": "存在多条完整合法路线时进行比较并选择。成本比较只是依据，不代表系统自动判定“最佳路线”。",
  "app.Today is the daily execution view": "“今天改什么”是日常执行视图",
  "app.Use Today after planning to see what can be advanced now and the concrete conditions for the next improvement action.": "完成规划后，用“今天改什么”查看现在能推进什么，以及下一次改修所需的具体条件。",
  "app.Statistics is the planning overview": "统计是整体规划视图",
  "app.Review plan progress, resources, owned amounts, and shortages without mutating the underlying plans.": "查看计划进度、资源、当前持有和缺口，但不会修改底层计划。",
  "app.Manage detail sections can show, hide, and drag ordinary detail areas into your preferred order.": "“管理详情区域”可以显示、隐藏普通详情区，并通过拖动调整顺序。",
  "app.Allocation suggestions never change assignments automatically; only an explicit confirmation updates the assignment.": "分配建议不会自动修改分配；只有用户明确确认后才会更新。",
  "app.Configuration and backup export durable user settings and planning state, not rebuildable runtime caches.": "配置与备份保存可持久化的用户设置和规划状态，不包含可重建的运行时缓存。",
  "app.Recovery and diagnostics can clear rebuildable caches without deleting plans, route choices, assignments, or low-priority equipment.": "恢复与诊断可以清理可重建缓存，不会删除计划、路线选择、分配或低优先装备。",
  "app.Set equipment that should be used later than normal before building large plans.": "建立大型计划前，先设置希望比普通装备更晚使用的低优先装备。",
  "app.Low priority changes recommendation and allocation order; it is not a blacklist and does not make a route illegal.": "低优先只影响推荐和分配顺序；它不是黑名单，也不会让路线变得不合法。",
  "app.You can review recommendation reasons, add equipment manually, and remove selected entries in batches.": "可以查看推荐理由、手动添加装备，并批量移除已选择条目。",
  "app.Find equipment, inspect its state, and create or manage explicit plans.": "查找装备、查看状态，并建立或管理明确计划。",
  "app.Search and filters narrow the equipment list; selecting an entry opens its ownership, plans, route, assistant-ship, and cost details.": "搜索和筛选用于缩小装备列表；选择条目后可查看持有、计划、路线、秘书舰和成本详情。",
  "app.Build the plan here first, then confirm its route before returning to Today for daily execution.": "先在这里建立计划，再确认路线，最后回到“今天改什么”进行日常执行。",
  "app.Route selection guide": "路线选择指南",
  "app.Compare complete routes, stages, and material costs before choosing the route used by a plan.": "在为计划选择路线前，比较完整路线、阶段和材料成本。",
  "app.A displayed route is not automatically the best route in every situation; the final route choice remains explicit.": "显示出来的路线并不代表任何情况下都是最佳路线；最终路线仍由用户明确选择。",
  "app.Material rows can be shown or hidden without changing route identity or calculation.": "材料行可以显示或隐藏，但不会改变路线身份或计算结果。",
  "app.Use Today as the daily execution entry after plans and route choices are ready.": "计划和路线选择准备好后，把“今天改什么”作为日常执行入口。",
  "app.Review the current assistant ship, available days, materials, remaining plan work, and next improvement action.": "查看当前秘书舰、可改日期、材料、计划剩余工作和下一次改修操作。",
  "app.Search and sorting organize the list; they do not change the underlying plan.": "搜索和排序只用于整理列表，不会改变底层计划。",
  "app.Statistics guide": "统计指南",
  "app.Review overall plan progress and resource shortages from a read-only overview.": "通过只读总览查看整体计划进度和资源缺口。",
  "app.Use the overview to inspect plan state, resource gaps, current holdings, and equipment or consumable shortages.": "用总览查看计划状态、资源缺口、当前持有以及装备或耗材短缺。",
  "app.Statistics never modifies plans, routes, or assignments.": "统计不会修改计划、路线或分配。",
  "app.Manage detail sections guide": "管理详情区域指南",
  "app.Choose which ordinary detail areas are visible and drag them into the order you prefer.": "选择显示哪些普通详情区域，并拖动到你习惯的顺序。",
  "app.Drag-to-reorder is intentional: adjust it once if the default detail order does not match how you work.": "这里支持拖动排序：如果默认详情顺序不符合你的习惯，建议第一次使用时主动调整一次。",
  "app.Required action sections are not hidden by ordinary layout preferences.": "必须处理的操作区域不会被普通布局偏好隐藏。",
  "app.Allocation suggestions guide": "分配建议指南",
  "app.Review cases where an already-available item can advance a selected plan route further.": "查看已有可用装备能否让已选计划路线从更靠后的节点开始。",
  "app.Suggestions are advisory and never change an assignment automatically.": "建议只用于提示，绝不会自动修改分配。",
  "app.Only the current actionable suggestion is operable; update history is read-only and has no rollback action.": "只有当前可执行建议可以操作；更新记录只读，不提供回滚。",
  "app.Configuration and backup guide": "配置与备份指南",
  "app.Export, import, and back up durable plugin configuration and planning state.": "导出、导入并备份可持久化的插件配置和规划状态。",
  "app.Backups preserve durable user intent such as plans, route choices, assignments, and preferences.": "备份保存计划、路线选择、分配和偏好等持久用户意图。",
  "app.Rebuildable runtime caches are not durable configuration and can be regenerated.": "可重建的运行时缓存不是持久配置，可以重新生成。",
  "app.Recovery and diagnostics guide": "恢复与诊断指南",
  "app.Use recovery tools for cache problems and export diagnostics when investigation is needed.": "遇到缓存问题时使用恢复工具，需要进一步调查时导出诊断信息。",
  "app.Clearing runtime caches does not delete plans, route choices, assignments, low-priority equipment, or other durable intent.": "清理运行时缓存不会删除计划、路线选择、分配、低优先装备或其他持久用户意图。",
  "app.Configuration health and diagnostic export help inspect problems without turning diagnostics into a second state authority.": "配置健康检查和诊断导出用于调查问题，但诊断不会成为第二套状态权威。",
  "development.Active on Today": "已用于“今天”",
  "development.Add": "添加",
  "development.Add any unfinished plan to this Development calculation": "把任意未完成计划加入本次开发计算",
  "development.Additional equipment": "额外装备",
  "development.At least one demanded equipment has no known Development formula": "至少一个目标装备没有已知开发公式",
  "development.Available plans": "可加入的计划",
  "development.Calculate best formulas": "计算最优公式",
  "development.Cannot calculate safely": "当前无法安全计算",
  "development.Current target demand": "当前目标需求",
  "development.Development data is unavailable": "开发数据不可用",
  "development.Development queue": "开发队列",
  "development.Development task": "开发任务",
  "development.Development task %d": "开发任务 %d",
  "development.Equipment id or name": "装备 ID 或名称",
  "development.Fuel": "燃料",
  "development.Ammo": "弹药",
  "development.Steel": "钢材",
  "development.Bauxite": "铝土",
  "development.Secretary ships: %s": "秘书舰：%s",
  "development.Expected development materials: %s": "期望开发资材：%s",
  "development.Targets in this formula: %s": "本公式目标：%s",
  "development.Manual equipment demand is added on top of Plan demand": "手工装备需求会叠加在计划需求之上",
  "development.Matching secretary ships: %d": "可用秘书舰：%d",
  "development.No plans added yet": "尚未加入计划",
  "development.No safe Development recommendation is available for this demand": "当前需求没有可安全给出的开发推荐",
  "development.No unfinished plans are available": "没有可加入的未完成计划",
  "development.Plans in this calculation": "本次计算的计划",
  "development.Public Development data is not complete enough to rank this demand safely": "Public Development 数据不足以安全地对这组需求排序",
  "development.Save combination": "保存组合",
  "development.Saved development tasks": "已保存的开发任务",
  "development.Some queued plans do not have a current Final Plan resolution yet": "队列中仍有计划没有当前 Final Plan Resolution",
  "development.Task name": "任务名称",
  "development.This demand is too large for the current exact optimizer": "这组需求超过当前精确优化器的安全状态空间",
  "development.Use best formula on Today": "采用 #1 并显示到“今天”",
  "development.Waiting for current final plan resolution": "等待当前 Final Plan Resolution",
  "development.Current development": "当前开发",
  "development.The active Development task needs recalculation in Statistics.": "当前开发任务需要到“统计”中重新计算。",
  "development.Plan demand completed": "计划需求已完成",
  "development.Plan is no longer available": "计划已不存在",
  "development.Current Development demand is complete.": "当前开发需求已完成。",
  "app.Statistics analysis": "统计分析",
  "statistics.Statistics analysis": "统计分析",
  "statistics.Base materials": "基础材料",
  "statistics.Development formulas": "开发公式",
  "statistics.Development formulas (experimental feature)": "开发公式（实验性功能）",
  "statistics.Total demand": "总需求",
  "statistics.Progress": "进度",
  "statistics.Development data is unavailable": "开发数据不可用",
  "development.Improvement target %s · %d remaining plans": "改修目标 %s · 剩余 %d 个计划",
  "development.Improvement targets in this calculation": "本次计算的改修目标",
  "development.No improvement targets added yet": "尚未加入改修目标",
  "development.Available improvement targets": "可加入的改修目标",
  "development.Add an improvement target; its current consumable gaps become Development formula inputs": "加入改修目标；该目标当前的耗材缺口会成为开发公式输入",
  "development.Manual equipment demand is added on top of selected Plan consumable gaps": "手工装备需求会叠加在所选计划的耗材缺口之上",
  "development.No unfinished improvement targets are available": "当前没有未完成的改修目标",
  "development.No plans with current developable consumable gaps are available": "当前没有包含可开发耗材缺口的计划",
  "development.Some queued improvement targets do not have a current consumable-gap resolution yet": "部分队列中的改修目标尚未形成当前耗材缺口",
  "development.Current Development input demand": "当前开发公式输入",
  "app.5. Review overall gaps in Statistics analysis": "5. 在统计分析中查看整体缺口",
  "app.Use Statistics analysis to inspect plan progress, base materials, equipment demand, Development formulas, and improvement success rates. It is read-only and does not change plans.": "使用统计分析查看计划进度、基础材料、装备需求、开发公式和改修成功率；这里是只读分析，不会修改计划。",
  "app.Statistics analysis is the planning overview": "统计分析是计划的整体分析视图",
  "app.Statistics analysis guide": "统计分析指南",
  "app.Review plan progress, base materials, equipment demand, Development formulas, and success rates from a read-only analysis workspace.": "在只读分析工作区查看计划进度、基础材料、装备需求、开发公式和成功率。",
  "app.Statistics analysis never modifies plans, routes, or assignments.": "统计分析不会修改计划、路线或分配。",
  "app.Set low-priority equipment, build plans in Equipment library, choose routes, execute from Today, then review overall gaps in Statistics analysis.": "设置低优先装备，在装备库建立计划并选择路线，从“今天”执行，再到“统计分析”查看整体缺口。",
  "development.Plans with actual consumable gaps": "有实际耗材缺口的计划",
  "development.Only plans with current actual equipment gaps are listed": "仅显示当前仍有实际装备耗材缺口的计划",
  "development.Selected consumable gaps": "已选耗材缺口",
  "development.These current consumable gaps plus manual demand are the Development formula input": "这些当前耗材缺口与手工需求共同作为开发公式输入",
  "development.The selected targets currently have no actual equipment consumable gap": "所选目标当前没有实际装备耗材缺口",
  "development.No current selected consumable gaps": "当前没有已选耗材缺口",
  "development.Plans with developable consumable gaps": "有可开发耗材缺口的计划",
  "development.Only plans with current developable equipment gaps are listed": "仅列出当前仍有缺口且存在开发公式的装备耗材",
  "development.Selected developable consumable gaps": "已选可开发耗材缺口",
  "development.These developable consumable gaps plus manual demand are the Development formula input": "这些可开发耗材缺口与手工需求共同作为开发公式输入",
  "development.No current selected developable consumable gaps": "当前未选择可开发耗材缺口",
  "development.The selected targets currently have no developable equipment consumable gap": "所选目标当前没有可开发的装备耗材缺口",
  "development.No selected equipment can currently be developed from the public Development data": "所选装备在当前公开开发数据中均没有可用开发公式",
  "development.Development formulas are known, but exact probability is unavailable for expected-cost optimization": "已知开发公式，但公开数据缺少精确概率，无法进行期望成本优化",
  "development.Exact optimization was split into %d independent groups; unknown cross-group gains are not counted.": "已自动拆分为 %d 个可精确计算的独立组；跨组未知收益不计入期望。",
  "development.Not included because no Development formula is known": "未纳入：当前没有已知开发公式",
  "development.Not included in expected-cost optimization because exact probability is unavailable": "未纳入期望成本优化：缺少精确概率",
  "app.changelog_1_2_9_development_formulas": "新增开发公式（实验性功能）：从计划的可开发实际耗材缺口计算推荐配方，显示秘书舰、资源配比与期望开发资材；已满足或不可开发的装备不会阻塞其他需求，无法安全联合计算时会自动拆分。",
  "app.changelog_1_2_9_statistics_analysis": "完善统计分析：新增独立装备需求视图、基础材料总需求与进度，并支持点击列头排序（装备按分类排序）；同时调整恢复与诊断界面的操作顺序。"
}
