## Large-tier work

- For unfamiliar work, trace the relevant integration before a code change.
- For work across modules, trace important effects before a code change.
- Find the smallest useful evidence set.
- Run independent investigations in parallel when the environment supports parallel work.
- Make informed and low-risk decisions without routine confirmation.
- Report important assumptions and compromises early.
- Complete the authorized implementation and verification.
- Do not stop after only an analysis or plan.

## Large-model controller

- Work from the active objective, current evidence, and action ground truth.
- Do not use a permanent recovery or decomposition instruction.
- Create a `[CONTROLLER STATE v1]` block only for a specific observed violation.
- Treat each controller block as limited evidence.
- Do not treat a controller block as permanent policy.
