# Deliver the agreed outcome

Read for non-trivial delivery and before reporting a blocker. Ordinary autopilot
uses this contract. `yolo` or `yolo mode`, when explicitly requested for this
workflow, is an alias for persistent execution of authorized work. It changes
neither permissions, model, budget nor the host's safety controls. It is not a
CLI flag or another skill.

## Establish the goal without another prompt

For substantial implementation, automatically derive an observable outcome and
DoD from the owner's request before editing. Reuse the existing tracker; if work
needs durable state, write a short task-local Markdown goal. Keep only acceptance,
current progress, authority and the next useful step. Do not ask the owner to
name the file or restate an already clear goal. Small answers need no artifact.

Prefer a current short-term goal linked to the owner's long-term direction or
maintained roadmap. Partition accepted outcomes into visible milestones, keep
the whole goal open while a required item remains, and choose the next ready
unit as each stage closes. Do not invent an LDD method when the acronym or
source is unresolved.

When the host offers a native goal, set the outcome and DoD there for substantial
work under the host tool contract, so the owner can see whether the goal is running,
paused or stopped. Keep the TODO visible too: mirror the canonical TODO in the
host's plan or todo tool when it has one, otherwise show the Progress checklist.
Reuse an existing goal; never replace an unfinished
goal or invent a token budget. Read back native goal creation before claiming it.
A Markdown goal does not promise scheduled continuation or automatically press
START. When START is owner-only, explain that requirement once; never claim it
was resumed. Within available execution time, continue useful authorized work.

When the owner requests an end-to-end result, including an idea that becomes
an SDD, bind one overarching goal to all of that SDD's acceptance IDs. An explicit
"execute the whole SDD" request has the same effect. Do not substitute a local milestone, plan approval,
or test suite for the whole outcome. Automatically maintain a visible TODO:
`[x] accepted with evidence`, `[>] executing`, `[ ] remaining`, `[!] blocked`.
After each accepted stage, update the canonical tracker, show the changed TODO
items and move to the next ready stage without requesting "continue". Keep
blocked IDs open while independent stages advance. Use short stage labels; link
long evidence. No phase silently disappears from the full-scope acceptance set.

A request to set a goal or execute the whole SDD with a goal authorizes native
goal creation when the host permits it. If the host requires an explicit native
goal request and the wording does not meet that requirement, maintain the
Markdown goal and ask once in BUDDY if native continuation is wanted. Never imply
that a Markdown file activated host scheduling. Update the file after each stage;
use native updates only for operations the actual tool supports. A host that only
supports complete/blocked must not receive invented native progress updates.

Carry authority across turns. Translate "go ahead" against the immediately
proposed concrete action and preserve its target and exclusions. Do not ask for
permission again for that action. New consequences outside that scope still need
approval. A worker's completion is one milestone, not completion of the goal.

## BUDDY: collect the permission package once

After initial read-only discovery, identify the concrete actions needed to finish
the whole scope. Classify each as already authorized, routine/reversible within
scope, or requiring a missing owner decision. Resolve routine implementation
choices yourself. Ask one bundled, plain-language question only for missing
consequential permissions. Name exact projects/targets and effects: for example
merge these changes, deploy this service, or create this paid resource within a
specified ceiling. Include browser actions when they carry those effects; merely
opening a page is not a separate permission category.

Record the answer and any exclusions in the existing tracker. Do not seek a blank
check to spend, message people, delete data or bypass controls. Unforeseen new
consequences still need consent. Preserve refusals and ceilings across stages.
If a late gate is unavoidable, finish its preparation first and continue any
independent work while the question is pending.

## Short work communication

Use terse, natural progress text: result, TODO delta, next action. Avoid repeated
skill announcements, schema dumps and unchanged polling narration. Do not enforce
a word count that loses conditions, errors, commands or required human actions.
Keep authored documents and product copy complete and natural.

For a true owner blocker, say: `Blocked: <acceptance item>. Tried: <method/result>.
You: <exact action and destination>. Then: <how work can resume>.` Include an
exact link or copy-ready command when verified. Do not ask the owner to invent
the next diagnostic step. A paused native goal with an owner-only START requires
an explicit START callout, not a claim of automatic resumption.

## Resolve an obstacle before escalating it

Separate authority from capability: a permitted action may lack a tool, and an
available tool may not authorize an action. Before saying BLOCKED, identify the
exact failed operation and the acceptance item it prevents. Then:

1. Check related instructions and current evidence, including prior permission.
2. Discover the relevant supported API, CLI or browser capability. An authenticated
   UI step is agent work when its action and target are already authorized. Inspect
   the UI, perform the step and read back the result rather than asking the owner
   to click merely because it is in a browser.
3. If the preferred method is technically unavailable, try a relevant permitted
   alternative within the same scope. Never evade an access denial, approval
   rejection, sandbox or an explicit channel restriction through another method.
4. A missing credential means inspect the documented credential location or normal
   login flow without exposing secrets. Human MFA, unavailable entitlement and
   an owner-only decision remain genuine blockers for dependent work.
5. Continue independent acceptance items. One blocked integration cannot turn
   an entire backlog into BLOCKED or justify unrelated speculative work.

A failed test is a repair task. Missing evidence is a verification task when the
agent can obtain it. A missing optional helper is a MAIN fallback. Poll timeouts
are observations; preserve the same handle and use bounded waits. A terminal
worker failure requires reconciling writes before MAIN takes over. Do not use a
terminal failure to justify accepting unreviewed output.

When no permitted path remains, report only: the blocked acceptance item, attempted
method and observed error, why relevant alternatives cannot complete it, the exact
missing human action/access, and what independent work was completed. Distinguish
OWNER_ACTION, EXTERNAL_UNAVAILABLE, POLICY_DENIED and TECHNICAL_FAILURE. Apply
native goal blocked-state rules separately; do not mark a whole goal blocked while
useful authorized work remains. Never turn an unknown right/license into consent.

## Keep review proportional to progress

Scale verification to blast radius. A reversible, low-risk change may proceed on
green automated tests, review and security checks. CI configuration, credentials,
security-sensitive paths (such as authentication, permissions, payments and personal
data), data migrations and irreversible effects need an independent review and
remain owner-gated, however small the diff. Work from an untrusted or unknown author
never takes the low-risk path. A user-interface change needs rendered evidence, a
screenshot or recording, before and after where possible; unit tests alone do not
prove it. An agent's approval never counts as the owner's.

Review the next executable slice against concrete acceptance and failure paths.
For a stable slice, default to one review and one focused correction verification.
More review needs a newly evidenced material defect or changed risk, not a new
amendment number, stylistic preference or desire for perfect prose. Preserve
required independent/security gates; a review budget never makes a failed gate pass.

After repeated review without accepted progress, stop the whole-plan loop. Deduplicate
findings, retain blockers for the affected slice, defer non-blocking suggestions,
and implement an already-authorized independent slice or resolve the concrete
blocking defect in MAIN. Escalate only an actual unresolved owner choice. Do not
reset the review budget by renaming a plan or opening a new reviewer task.

Prefer maintainable code over line-count games. Honor real project limits by
cohesive decomposition; do not invent arbitrary caps or spend worker cycles on
blank-line shaving. Re-run only checks affected by the final change plus required
repository checks. Finish after acceptance, not after an arbitrary quantity of
reviews, tests or generated files.

## Coordinated team execution

MAIN owns the full outcome, coordination, critical path, dependencies, integration,
owner decisions and acceptance. The default is one MAIN loop that loads skills on
demand and runs independent tool calls in parallel. A worker costs several times the
tokens of the same work in one loop, every handoff loses detail, and parallel workers
often finish later than one loop would. Delegate a unit to a native worker only when
at least one condition holds and outweighs that cost:

- parallel work: the unit is independent, substantial and needs little of MAIN's
  context, so a fresh, discardable context covers it sooner or more thoroughly;
- context isolation: the unit would flood MAIN with output it mostly does not need,
  such as a wide search, a long log or a large read, and can return a compact result;
- independent verification: a reviewer that should not share the author's reasoning;
- specialization: the unit needs tools or instructions that conflict with MAIN's.

Name the condition for each delegated unit in the current plan; without one, the
unit stays in MAIN. Split by context, not by type of work: the worker that changes a
feature also writes and runs its tests, and planning, implementation and testing of
one unit are not split across workers. Give each worker a short task packet, not the
whole conversation, and ask for a concise report. Send narrow, mechanical work to a
cheaper model under the host's policy. Each worker's model and effort come from that
policy; the workflow names no model. When several units qualify, dispatch them
together within verified host capacity and authorized usage limits, before executing
non-trivial work or entering a blocking wait. Eligibility also requires accepted
dependencies, authority, a supported route and a free write scope. One visible MAIN
coordinator is compatible with many native workers. Before a large or risky
multi-writer fan-out that is not already executable, run the
[builder-readiness check](idea-to-delivery.md#builder-readiness-check); skip it for
already-executable plans and mechanical changes.

When an owner or host rule requires more delegation than these conditions give, that
rule controls; record it in the plan.

A single bounded native delegate needs no Dispatcher queue; MAIN keeps coordination
and acceptance. Use the [small native-worker packet](communication.md#small-native-worker-packet).
Durable queues retain the [long-run state](long-run-state.md) and full
Sessions/Dispatcher contract. Visible conversations follow the
[canonical rule](../SKILL.md#choose-the-smallest-workflow); never substitute
them for unavailable native workers.

Target concurrency is the minimum of the effective host/model limit, authorized
usage limits and the units that qualify for delegation. A configured ceiling is not proof
of available runtime slots. Count running reviewers, existing live workers and any
permitted descendants too. If capacity is unknown, dispatch ready units
incrementally within host policy and remaining quota until a capacity refusal;
never spawn dummy probes. Reconcile uncertain spawn results by ID before retrying.
If a send may have succeeded but returned no ID,
reserve its possible capacity and write scope; do not retry or run that unit in
MAIN until the host proves no worker is executing. Record delivery UNKNOWN in
the existing tracker. This differs from proven pre-send unavailability, which
permits MAIN fallback. A refusal reduces concurrency; it is not a goal
blocker. Do not duplicate a unit after an uncertain send or timeout. Never bypass
a host restriction.

Use [communication](communication.md) for assignments and reports: plain
technical English between agents by default, with the artifact language explicit
when different. Preserve required formats and explicit language overrides.

Each assignment names one bounded outcome, exact inputs/version, write scope,
dependencies, owning method, authority, acceptance evidence, model/effort, budget
and stop conditions. Schedule independent implementation, research and verification
together only when mutable state does not overlap. Keep one owner for every shared
mutable resource: files, browser/profile, test database, port, migration, generated
artifact and integration surface. Use isolated worktrees where appropriate, then
integrate explicitly. No duplicate investigations of the same question; read-only
reviews may share frozen input when their questions are distinct.

Use flat MAIN-owned delegation by default. Recursive delegation requires express
assignment authority and a reserved capacity slot under the same verified host
capacity. A host or owner prohibition remains controlling. Without reliable
cross-tree accounting, keep delegation flat. Apply the [model policy](model-routing.md),
including its Codex delegated preset; preserve explicit owner overrides.

Prioritize work that unblocks downstream stages. MAIN advances useful integration
or unresolved dependencies while workers execute. Queue excess ready units. On each
worker completion, MAIN reconciles the exact returned ID, inspects the current
artifact, assigned scope and required proof, and verifies that the worker has
stopped writing. Then release only that unit's proven ownership, recompute readiness
and dispatch newly ready work without waiting for unrelated slow workers. A
worker's report, exit code or self-score does not accept its artifact. When a batch
partly fails, resend only the failed units with their new evidence; never rerun the
accepted ones.

A waiting, suspended or uncertain worker has a stated reason and a bounded next
observation in the current tracker. Reserve its scope and possible capacity until
exact-ID readback reconciles its state. Prefer native completion notifications or
bounded waits on the same IDs; wait only when no useful independent work remains
for MAIN or available slots. Do not poll unchanged status as a substitute for work.

Keep quota/cost ceilings, API/test-environment limits, runtime health warnings/hard
limits, credential boundaries, owner gates and refusal handling. Shared sequential
work remains serial. No filler units, speculative future work, fixed swarm or
duplicated full-context prompts. Do not split a tiny task merely to reach a number.
Measure progress by accepted outcomes and elapsed delivery, never by agent count
or messages sent. Claims about speed, token use or quality require measured
evidence; dispatch alone proves none of them.

## GDD: goal-driven delivery through milestones

The [approved-plan autopilot loop](autopilot.md) owns select, execute, check,
review, correct and advance. This section owns the milestone map and its state
transitions; use both without creating a second tracker.

GDD is this workflow's execution pattern, not a new skill or a claim of inventing
Goal-Driven Development. SDD owns requirements; the existing task tracker owns
milestones and current state. For whole-SDD execution, derive milestones from its
acceptance set. Each milestone records an ID, observable outcome, acceptance IDs,
dependencies, owner, write scope, evidence and state. Every required acceptance ID
must be assigned; cross-cutting criteria need a final integrated check.

Use `PENDING -> READY -> RUNNING -> VERIFYING -> ACCEPTED`. `READY` requires
accepted dependencies, necessary permission and a free write scope. A failed
verification returns to repair; an external dependency marks only the affected
milestone `BLOCKED` with its evidence and unblock action. Resume after fresh
verification of that action. Superseded requirements invalidate only affected
milestones and downstream evidence. Completed workers never self-accept.

After each milestone, MAIN verifies evidence, updates the existing TODO and
selects the next ready work without waiting for a new user prompt. Independent
milestones may run together up to the target concurrency in
[coordinated team execution](#coordinated-team-execution). Keep one overarching goal open
until every required milestone and integrated DoD passes. Do not complete and
replace the native goal for each milestone. Native goals mirror the DoD where the host
offers them; Markdown remains the portable record. Host pauses or quotas can suspend execution,
so preserve the next action without promising an automatic wakeup.