# Feature plan

> User-visible execution contract. The Coordinator iterates it with the user before code.
> Keep it to the smallest plan that still covers scope, agents, tests and evidence.

**Aprobado:** pendiente
**Scope:** `path/**`

> The runtime reads this first `Aprobado:` line and this top-level `Scope:`. Record `sí`, the
> user's words and date by replacing only that line after the user approves. Present the
> plan's path on its own `Plan: <path>` line when asking for approval. Every step stays
> inside the top-level scope, including verification specialists.

## Problem and users

## Observable outcome

## Scope

### In scope

### Out of scope (non-goals)

## Constraints

- Platforms and environments:
- Data, privacy, security, permissions:
- Accessibility explicitly requested:
- Compatibility and contracts:
- Time and dependencies:

## Approach and options

| Option | Trade-offs | Recommendation |
|---|---|---|

## Development plan

| # | Step | Agent | Depends on | Parallel with | Scope | Evidence |
|---|---|---|---|---|---|---|
| 1 |  |  | — | — |  |  |

- One writer per slice. Parallel steps must have disjoint `Scope` globs.
- `Scope` globs are relative to the workspace root; in a meta-repo include the child prefix
  (for example `repos/api/src/**`).
- Every delegation carries `Plan:` (this file), `Scope:`, the step, acceptance and evidence.

## Test plan

### How to run and test the app

- Environment, app/client and device or browser:
- Prerequisites, fixture/seed data and isolation:
- Setup/start commands, entry point (URL, screen, API or CLI), automated commands and manual steps:
- Cleanup or reset between runs:

### Golden Paths

| ID / criterion | End-to-end journey | Owner / level | Environment / data | Steps or command | Expected result | Evidence |
|---|---|---|---|---|---|---|
| G1 |  |  |  |  |  |  |

### Dark Paths

| ID / criterion | Trigger / priority | Owner / level | Environment / data | Steps or command | Expected safe state / recovery | Evidence |
|---|---|---|---|---|---|---|
| D1 |  |  |  |  |  |  |

### Third-party dependencies

| Service | Fake or contract checks | Real/sandbox check and failure case | Access owner / prerequisites | Evidence or blocker |
|---|---|---|---|---|

### User participation

| Case | Who and when | Exact action or confirmation | Evidence and owner if blocked |
|---|---|---|---|

Use `None` with a reason when a dependency or human check does not apply. At verification,
record `passed`, `failed`, `blocked` or `not run` for each case, with evidence and next action.
An unexecuted must-pass case blocks closure.

## Risks and rollback

| Risk | Impact | Mitigation |
|---|---|---|

- Rollback:

## Destructive operations

List any operation that deletes files, drops or truncates data, or destroys volumes or
infrastructure. Each one requires the user's explicit authorization before execution, separate
from this plan's approval.

## Closure

- End-to-end path that must work:
- Evidence required per acceptance criterion:
- Residual risks accepted by:

The single approval at the top covers the scope, criteria, approach, specialists and tests.
