CNC Machine
Performance
% Breakdown resolved within 4 hrs
92%
Machine Availability
73.41%
Productivity (% completed vs planned)
68.5%
Notifications
Important insights will presented as a notifications. Advance Data Analytics. Please checkout the full documentation.
Notification states
Info - Friday 29/01/2021 10:45:36 Machine 5/A/2145 reconnected
Success - Friday 29/01/2021 08:30:45 Machine 19/A/2055 connected successfully
Warning - Friday 29/01/2021 16:29:31 Machine 5/A/2057 Current in X-Axis is 75% higher than expected, Plan for preventive maintenance
Danger - Friday 29/01/2021 14:29:38 Machine 5/A/2071 Vibrations in B-Axis is 180% higher than expected, Proceed immediately for maintenance
Primary - Friday 29/01/2021 21:29:31 Machine 5/A/2057 is turned off, Monitoring closed, Will retry connection after 30 minutes
