# DORA — ICT Third-Party Risk Management Reference

Chapter V, Articles 28–44, Regulation (EU) 2022/2554.
Key implementing measures: CDR (EU) 2024/1773, CIR (EU) 2024/2956, CDR (EU) 2025/532,
CDR (EU) 2024/1502, CDR (EU) 2024/1505, CDR (EU) 2025/295, CDR (EU) 2025/420.

---

## Overview: Two-Track Structure

Chapter V operates on two parallel tracks:

**Track 1 — Entity-level obligations (Art. 28–30):**
Every financial entity must manage its own ICT third-party risks — regardless of
whether its TPSPs are designated critical.

**Track 2 — Systemic oversight of designated CTPPs (Art. 31–44):**
ESAs designate and oversee ICT TPSPs that are systemically important to the
EU financial sector. This is a supervisory regime, not an entity-level compliance task.

---

## Art. 28 — General Principles for ICT Third-Party Risk

### Art. 28(1) — ICT Third-Party Risk Policy
Every financial entity must adopt, regularly review, and update an **ICT third-party
risk policy** covering:
- Objectives and principles for managing ICT third-party risk
- Criteria for identifying critical and important functions (CIF) vs. non-critical
- Pre-contractual due diligence requirements
- Contract lifecycle management (onboarding, monitoring, exit)
- ICT concentration risk management
- Governance roles and responsibilities

**Key RTS:** CDR (EU) 2024/1773, Art. 1–12 (detailed policy content)

### Art. 28(2) — Maintaining the Register of Information
Financial entities must maintain and update the **Register of Information** (RoI)
covering **all** ICT service arrangements (not only those supporting critical
functions). See the Register of Information section below for full field details.

### Art. 28(3) — Annual Submission of Register of Information
The RoI must be submitted to the competent authority **at least annually** and
upon specific request. The submission format follows CIR (EU) 2024/2956 templates.

### Art. 28(4) — Pre-Contractual Due Diligence
Before entering any new ICT service arrangement supporting a critical or important
function, financial entities must:
- **(a)** Assess whether the ICT service arrangement supports a critical or important function
- **(b)** Assess the risks of the arrangement, including ICT concentration risk
- **(c)** Carry out appropriate due diligence on prospective ICT TPSPs

The due diligence must be documented and commensurate with the criticality of
the function.

### Art. 28(5) — Ongoing Monitoring of ICT TPSPs
- Monitor the performance, security posture, and compliance of ICT TPSPs
  throughout the contract lifecycle
- Conduct regular reviews aligned with the contract terms and risk profile
- Verify that ICT TPSPs continue to meet agreed service levels and security standards

### Art. 28(6) — ICT Concentration Risk Assessment
Financial entities must:
- Assess the **concentration risk** arising from reliance on a single or limited
  number of ICT TPSPs for critical functions
- Determine whether the failure or unavailability of any TPSP would threaten the
  entity's ability to maintain critical functions
- Document this assessment and factor it into risk appetite and strategy

**Common scenario:** A bank using a single hyperscaler (e.g., one major cloud
provider) for core banking, treasury, and fraud detection creates high concentration
risk even if the TPSP is not designated critical.

### Art. 28(7) — Exit Strategy
For each ICT arrangement supporting a critical or important function, financial entities must:
- Develop and maintain an **exit strategy** covering:
  - Conditions and triggers for exit
  - Minimum notice period required to migrate services
  - Data portability and return procedures
  - Transition assistance obligations of the departing TPSP
- Test exit strategies periodically (frequency: risk-based)

---

## Art. 29 — Preliminary Assessment of ICT Concentration Risk

Before entering a new arrangement that would cause an entity's concentration in
a single TPSP to increase for critical functions:
- Conduct a specific **concentration risk assessment**
- Document the assessment outcome and risk mitigation measures (if any)
- Consider the systemic implications if the concentrated TPSP were to fail

This is a transaction-specific obligation (triggered by entering a new arrangement)
rather than an ongoing monitoring obligation (which is covered by Art. 28(6)).

---

## Art. 30 — Key Contractual Provisions

### Scope: When does Art. 30(2) apply?

Art. 30(2) applies to contracts for ICT services that support **critical or important
functions**. A lighter set of provisions applies to non-critical arrangements
(Art. 30(3)).

### Critical or Important Function (CIF)

A function is critical or important if its disruption would:
- Materially impair the financial entity's compliance with legal obligations
- Materially impair its financial performance, or
- Materially impair the soundness or continuity of its services

The criteria for identifying CIF are further specified in CDR (EU) 2024/1773.

### Mandatory Contractual Provisions — Art. 30(2)(a)–(i)

| Provision | DORA Requirement |
|-----------|-----------------|
| **(a)** Service description | Clear and complete description of the ICT services to be provided |
| **(b)** Data locations | Location(s) where services will be provided and data stored/processed, including notification obligations if locations change |
| **(c)** Data protection | Provisions ensuring data protection; compliance with applicable data protection law (GDPR where applicable) |
| **(d)** Availability, authenticity, integrity, security | Service level specifications; security standards; incident response obligations of the TPSP |
| **(e)** Audit and access rights | **Full and unrestricted audit rights** for the financial entity, its competent authorities (including ECB for significant institutions), and resolution authorities — including on-site inspection rights at the TPSP's premises |
| **(f)** Termination rights | Conditions under which the financial entity may terminate; minimum notice periods; the TPSP's obligation to provide transition services |
| **(g)** Reporting and monitoring | ICT incident reporting by the TPSP to the financial entity; performance monitoring; regular service reviews |
| **(h)** Data portability and migration | On termination, the TPSP must provide all data in machine-readable format; migration assistance; data deletion certification |
| **(i)** Sub-contracting | Conditions under which the TPSP may sub-contract ICT services; prior written consent requirement; equivalent contractual provisions in sub-processor contracts; right to audit sub-processors |

**Key RTS:** CDR (EU) 2024/1773 specifies the detailed content of each provision.
**Key RTS:** CDR (EU) 2025/532 specifies sub-contracting provisions in detail.

### The Audit Rights Problem (Art. 30(2)(e))

The most common contractual gap: large cloud providers offer only third-party
audit reports (e.g., SOC 2, ISO 27001 certificates) rather than direct audit
rights. DORA Art. 30(2)(e) requires:
- **Full and unrestricted** audit rights for the financial entity
- **Access rights for competent authorities** — including the right to inspect
  the TPSP's premises

ESA guidance has clarified that:
- Pooled or third-party audits (SOC 2, ISO 27001 certification) may partially
  satisfy the **entity's own audit right** where direct audit is genuinely
  impracticable at hyperscale TPSPs — but only if the entity documents in writing
  why direct audit is impracticable and confirms the pooled audit outputs are
  meaningful and sufficient
- Financial entities must still document their assessment of why pooled audits
  are acceptable and ensure they receive meaningful, entity-specific outputs
- **The competent authority's (and resolution authority's) on-site inspection
  right under Art. 30(2)(e) is NON-WAIVABLE.** Even where the entity accepts
  pooled audits, the contract must contain an express, unconditional clause
  preserving the competent authority's right to inspect the TPSP's premises
  directly. A clause that routes the authority's access through the TPSP's
  third-party audit programme does NOT satisfy Art. 30(2)(e). This is a common
  failure in standard cloud provider contracts.
- Acceptance of pooled audits must be documented with a written risk acceptance
  approved at an appropriate governance level (e.g., CRO or board)

### Lighter Provisions for Non-Critical Arrangements (Art. 30(3))

For ICT service arrangements that do not support critical or important functions:
- Service description
- Data locations
- Basic availability and security commitments
- Incident notification obligations
- Exit/termination provisions

Full Art. 30(2) provisions are not required.

### Art. 30(4) — Review Before Renewal

Before renewing any contract for ICT services supporting critical functions,
financial entities must review whether:
- Service levels remain adequate
- Audit and access rights remain exercisable
- Exit strategy remains viable
- New risks (concentration, substitutability) have emerged

---

## Register of Information — Complete Field Reference (CIR (EU) 2024/2956)

### When to Maintain and Submit

- **Ongoing maintenance:** Update when new arrangements are entered, modified,
  or terminated; when sub-processors change; when data locations change
- **Annual submission:** At least annually to the competent authority
- **On-demand submission:** Upon specific request from competent authority or ESA
  (for the oversight framework of CTPPs under Art. 31)

### Complete Field Set

The RoI is structured around **arrangements** — each row represents one ICT
service arrangement.

| Field | Field Name (CIR 2024/2956) | Description |
|-------|---------------------------|-------------|
| 1 | Reporting entity LEI | Legal Entity Identifier of the financial entity |
| 2 | Reporting entity name | Legal name |
| 3 | Reporting entity type | Regulated entity type (credit institution, insurer, etc.) |
| 4 | Arrangement reference | Unique internal reference for this arrangement |
| 5 | Arrangement type | Type (outsourcing, SaaS, IaaS, PaaS, data services, etc.) |
| 6 | TPSP legal name | Legal name of the ICT third-party service provider |
| 7 | TPSP LEI | LEI of the TPSP |
| 8 | TPSP country of establishment | Country (ISO 3166-1 alpha-2) |
| 9 | TPSP within group? | Is the TPSP part of the same corporate group as the entity? |
| 10 | ICT service type | Nature of services (per CIR classification codes) |
| 11 | ICT service description | Free-text description of specific services |
| 12 | Critical or important function (CIF)? | Y/N — does this arrangement support a CIF? |
| 13 | Function identifier | Reference to the function(s) supported |
| 14 | Function description | Description of the supported function |
| 15 | Data types processed | Classification of personal/non-personal data processed |
| 16 | Data sensitivity | Sensitivity level of data (e.g., customer PII, financial data) |
| 17 | Primary data storage location | Country(ies) where data is primarily stored |
| 18 | Secondary/backup data storage location | Country(ies) where backup data is stored |
| 19 | Contract start date | Effective date of the arrangement |
| 20 | Contract end date or rolling | End date or indication of indefinite/rolling |
| 21 | Notice period for termination | Minimum notice period (in days) |
| 22 | Sub-processors used? | Y/N — does the TPSP sub-contract any services? |
| 23 | Sub-processor names and LEIs | Name and LEI of each sub-processor |
| 24 | Sub-processor data locations | Country(ies) of data processing by sub-processors |
| 25 | Substitutability assessment | High / Medium / Low — ease of replacing this TPSP |
| 26 | Exit strategy reference | Reference to the exit strategy document for this arrangement |
| 27 | Last due diligence date | Date of most recent due diligence assessment |
| 28 | Audit rights exercisable? | Y/N — can audit rights be exercised per contract? |
| 29 | Audit method | Direct audit / pooled audit / third-party certification |

### Register of Information — Key Points

1. **All arrangements, not just critical ones.** The RoI covers every ICT service
   arrangement, not only those supporting critical or important functions. The
   criticality flag (field 12) distinguishes them within the register.

2. **Sub-processors must be captured.** For each arrangement, the full chain of
   sub-processors must be identified (fields 22–24). This is frequently incomplete
   in practice.

3. **Not a static document.** The RoI must be updated throughout the year as
   arrangements change; the annual submission is a snapshot of the current state.

4. **LEIs are mandatory.** Both the reporting entity and all TPSPs must have LEIs.
   Where a TPSP does not have an LEI, the entity should document this and use
   the TPSP's national business registration number as an alternative.

---

## ICT Concentration Risk — Practical Assessment

### What constitutes concentration risk under DORA?

**Horizontal concentration:** Multiple critical functions supported by a single TPSP
(e.g., core banking, fraud detection, and AML all on the same cloud provider).

**Sectoral concentration:** Many financial entities within the EU using the same
TPSP for critical functions — creating systemic risk even if each entity's own
dependency appears manageable.

**Geographic concentration:** All data and processing in a single geographic region
or data centre cluster, creating correlated failure risk.

### Concentration Risk Assessment Template

For each TPSP supporting critical functions, assess:

| Assessment Area | Question | Rating (H/M/L) |
|----------------|----------|----------------|
| Dependency depth | How many critical functions depend on this TPSP? | |
| Substitutability | Could this service be replaced within the entity's recovery time objectives? | |
| Contractual exit | Is there a viable exit path with adequate notice period and data portability? | |
| Financial stability | Is there material risk of the TPSP becoming insolvent or discontinuing the service? | |
| Geographic diversification | Are services provided from geographically diverse infrastructure? | |
| Regulatory enforceability | Are audit and competent authority access rights practically exercisable? | |

A TPSP rated High on any two or more areas should be treated as a concentration
risk concern requiring mitigation action.

---

## Oversight Framework for Critical ICT TPSPs (Art. 31–44)

### Designation of Critical ICT TPSPs (Art. 31)

ESAs (EBA, ESMA, EIOPA) jointly designate ICT TPSPs as **critical** based on
CDR (EU) 2024/1502 criteria. The designation process:

1. Financial entities submit their RoI annually
2. ESAs aggregate RoI data to map TPSP dependencies across the EU financial sector
3. ESAs apply CDR 2024/1502 criteria to assess systemic importance
4. Designated CTPPs are notified and published
5. ICT TPSPs not established in the EU that serve EU financial entities must
   designate an EU-established legal representative (Art. 31(11))

### Lead Overseer Assignment (Art. 32)

Each designated CTPSP is assigned a **Lead Overseer** — one of EBA, ESMA, or EIOPA
— based on the predominant type of financial entity served. The Lead Overseer
coordinates with other ESAs via the **Joint Oversight Network (JON)**.

**Joint Examination Teams (JETs):** Per CDR (EU) 2025/420, JETs are assembled
from Lead Overseer and national authority staff to conduct on-site and off-site
examinations of CTPPs.

### Oversight Powers (Art. 33–38)

| Power | Description |
|-------|-------------|
| Art. 33 — Information requests | Lead Overseer can require CTTPSs to provide information, data, and documents |
| Art. 34 — General investigations | Including interviews, document reviews |
| Art. 35 — On-site inspections | Physical inspection of CTPSP premises and systems |
| Art. 36 — Recommendations | Lead Overseer issues recommendations for improvement |
| Art. 37 — Follow-up | Follow-up recommendations and potential escalation |
| Art. 38 — Oversight fees | Annual fees per CDR (EU) 2024/1505 |

### What CTPSP Designation Means for Financial Entities

- **No direct obligations change** for the financial entity when its TPSP is
  designated critical — the entity's Art. 28–30 obligations apply regardless
- The Lead Overseer interacts with the **CTPSP directly**
- Financial entities must cooperate with information requests from the Lead
  Overseer about their use of designated CTPPs (Art. 40)
- Financial entities should note that oversight recommendations to a CTPSP
  may result in changes to service terms — monitor this

---

## Contract Review Checklist — DORA Art. 30(2) Compliance

Use this checklist when reviewing existing contracts or negotiating new ones:

| Clause | Required by | Present? | Gap? |
|--------|------------|---------|------|
| Clear service description | Art. 30(2)(a) | | |
| Data location — primary and secondary | Art. 30(2)(b) | | |
| Change notification for data locations | Art. 30(2)(b) | | |
| GDPR/data protection provisions | Art. 30(2)(c) | | |
| Service levels (availability, integrity, security) | Art. 30(2)(d) | | |
| Audit rights — financial entity | Art. 30(2)(e) | | |
| Audit rights — competent authority | Art. 30(2)(e) | | |
| Audit rights — resolution authority | Art. 30(2)(e) | | |
| Termination for cause | Art. 30(2)(f) | | |
| Termination for regulatory reasons | Art. 30(2)(f) | | |
| Minimum notice period on exit | Art. 30(2)(f) | | |
| Incident reporting by TPSP to entity | Art. 30(2)(g) | | |
| Data portability on exit | Art. 30(2)(h) | | |
| Migration assistance commitment | Art. 30(2)(h) | | |
| Data deletion/destruction certificate | Art. 30(2)(h) | | |
| Sub-contracting — prior consent | Art. 30(2)(i) + CDR 2025/532 | | |
| Sub-contracting — equivalent provisions | Art. 30(2)(i) + CDR 2025/532 | | |
| Sub-processor change notification | CDR 2025/532 | | |