{
    "A10": "Foundations",
    "A20": "Subgrade Enclosures",
    "A40": "Slabs-on-Grade",
    "A60": "Water and Gas Mitigation",
    "A90": "Substructure Related Activities",
    "B10": "Superstructure",
    "B20": "Exterior Vertical Enclosures",
    "B30": "Roofing",
    "C10": "Interior Construction",
    "C20": "Interior Finishes",
    "D10": "Conveying",
    "D20": "Plumbing",
    "D30": "HVAC",
    "D40": "Fire Protection",
    "D50": "Electrical",
    "D60": "Communications",
    "D70": "Electronic Safety and Security",
    "D80": "Integrated Automation",
    "E10": "Equipment",
    "E20": "Furnishings",
    "F10": "Special Construction",
    "F20": "Facility Remediation",
    "F30": "Demolition",
    "Z10": "General Requirements",
    "Z70": "Taxes, Permits, Insurance and Bonds",
    "Z90": "Fees and Contingencies"
}
