# Core Architecture v2 S6 Delegation Assessment

**Assessment timing:** completed after required source/test/caller inspection and before source edits.
**Baseline:** clean `core-architecture-v2` at `df0b6edd5bfa113aba722ada9b8b2ea0fd3cac36`.
**Slice:** S6 only.

## WorkUnit classification

| ID | Classification | Mechanism | Delegation rationale |
| --- | --- | --- | --- |
| S6-W1 | LUNA_OWNED | HYBRID | Contract and authority semantics cross S3 human/Lead controls, S4 assertion/evidence-strength compilation, acceptance policy, and normative lifecycle boundaries. |
| S6-W2 | LUNA_OWNED | HYBRID | Oracle resolution and disposition determine product acceptance and require cross-subsystem integration, evidence provenance checks, policy interpretation, and durable persistence. The current canonical policy digest must be obtained only after validating that its operation/candidate/execution/epoch fields match the current operation. |
| S6-W3 | FLASH_DELEGATABLE | DETERMINISTIC | The pure objective DoD evaluator is separable behind the exact frozen interface and rules in `CORE_ARCHITECTURE_V2_S6_WORKGRAPH.md`. It consumes controller-compiled facts and has no lifecycle, authority, policy-selection, or filesystem responsibilities. Every identity includes controller epoch, so takeover invalidates earlier acceptance/evidence/completion records. A separate worktree avoids concurrent writers. |
| S6-W4 | SEQUENTIAL_AFTER_CONTRACT_FREEZE | HYBRID | The managed Lead/oracle/delivery ordering is a lifecycle integration point and depends on frozen evidence and disposition contracts. |
| S6-W5 | LUNA_OWNED | DETERMINISTIC | Final integration review, gate validation, and status/conformance/ledger evidence reconciliation stay with the Slice Lead. |

## Delegation decision

Delegate S6-W3 to the configured `DeepSeek V4.1 Flash Implementer`. Before agent creation, Paseo `list_profiles` returned the following exact profile values, which are to be copied into the launch call:

- Profile: `DeepSeek V4.1 Flash Implementer`
- Provider: `opencode`
- Model: `opencode-go/deepseek-v4.1-flash`
- Mode: `build`
- Thinking: `max`
- Features: `{ "auto_accept": true }`

Launch uses the profile-composed provider/model value `opencode/opencode-go/deepseek-v4.1-flash`, `modeId: "build"`, `thinkingOptionId: "max"`, and `features: { "auto_accept": true }`. The worker is limited to `src/architecture/objectiveCompletion.ts` and `tests/objectiveCompletion.test.ts`; it must use **NO NESTED DELEGATION**.

S6-W3 is preferable to a no-delegation plan because its frozen pure-function interface and complete pass/block rules let Flash implement and exercise useful production logic without choosing acceptance semantics or touching lifecycle integration. Luna retains all semantic acceptance, authority, cross-subsystem, and final gate decisions. The interface explicitly binds `controllerEpoch` (a non-negative safe integer; zero is valid) and rejects evidence/dispositions/terminal identities from an older epoch; there is no takeover-survival exception. W2 separately validates the current `ResolvedOperationPolicyV1` binding before deriving `policyDigest`, and includes a takeover regression proving epoch rotation changes the canonical policy digest and invalidates prior-epoch evidence and terminal identity.

The Director's pre-edit certification review was resolved before W3 completion: since the frozen type has only optional `PASS | FAIL` and the target does not require a synthetic certification record, non-required certification is represented by omitting both disposition and identity; either supplied field blocks. This rule is now explicit in WorkGraph rule 5 and tested. The completed W3 focused test command passed 73 tests. Paseo worker records: initial W3 implementer `2297775c-ad18-4504-b902-09d22dc4d6f1`; epoch-zero correction `91f4bd06-dc8f-4587-88e0-c04cf3dd492b`; final consolidated evaluator report `936ce979-6181-42e3-b00c-521b3dff7fa6`. Flash worked in `/home/james/.paseo/worktrees/0jx5pvzi/s6-objective-completion-flash`, workspace `wks_4d4da53cce706036`; Luna owns current-checkout integration and final review. No nested delegation was used.

## Inspection evidence supporting the boundary

- `src/architecture/candidateAssurance.ts` already emits `AcceptanceAssertionV1` with candidate, impact digest, policy digest, dimensions, and evidence-strength floor; S6 consumes this interface.
- `src/core/run.ts` collects validation and independent review, then calls `finalizeAcceptedIssue` after review; its current PASS path has no production AcceptanceOracle before delivery.
- `src/agents/reviewLifecycle.ts` explicitly defers managed Lead semantic acceptance to the bound Lead, so S6 must preserve that authority and place the required Lead evidence before effects.
- `src/delivery/finalize.ts` enforces candidate, policy/action, epoch, and reconciliation checks but currently lacks a current AcceptanceOracle disposition gate.
- `src/operations/state.ts` and `src/operations/v2Contracts.ts` persist operation/candidate identity and terminal participant receipts; the terminal success check does not evaluate objective DoD.
- `src/certification/oracle.ts` and `src/certification/` are CertificationCore evidence, not a production change-operation acceptance oracle; they remain separate.
- `tests/candidateAssurance.test.ts`, `tests/runRepairCandidateLifecycle.test.ts`, `tests/reviewLifecycle.test.ts`, `tests/deliveryFinalize.test.ts`, `tests/operationV2Identity.test.ts`, and `tests/operationLifecycleRegression.test.ts` establish the current focused test boundaries.

No source code was changed before this assessment and WorkGraph were recorded.
