# summary

Check the status of a pipeline deploy operation.

# description

The first time you run any "project deploy pipeline" command, be sure to authorize the org in which DevOps Center is installed. The easiest way to authorize an org is with the "org login web" command.

Run this command by either indicating a job ID or specifying the —use-most-recent flag to use the job ID of the most recent deploy operation.

# examples

- Check the status using a job ID:

      <%= config.bin %> <%= command.id %> --devops-center-username MyStagingSandbox --job-id 0Af0x000017yLUFCA2

- Check the status of the most recent deploy operation:

      <%= config.bin %> <%= command.id %> --devops-center-username MyStagingSandbox --use-most-recent

# flags.job-id.summary

Job ID of the pipeline deployment to check the status of.

# flags.job-id.description

The job ID is valid for 10 days from when you started the deploy operation.

# flags.use-most-recent.summary

Use the job ID of the most recent deploy operation.

# flags.use-most-recent.description

For performance reasons, this flag uses job IDs for deploy operations that started in the past 3 days or fewer. If your most recent operation was longer than 3 days ago, this flag won't find the job ID.

# report.key.created-by-name

CreatedByName

# report.key.column

Key

# report.value.column

Value

# report.info.header

Info
