# Discovery Extraction

Discovery arrives in whatever form the owner could capture between jobs. Every one of these is a normal input, not a degraded one.

The output of this step is always the same structure, regardless of what came in:

```
Customer:      <who, and who signs>
Wants:         <the job, in their words>
Scope, clear:  <what is definitely in>
Scope, fuzzy:  <what is implied but not stated>
Constraints:   <access, timing, code, site conditions>
Out of scope:  <anything explicitly excluded>
Dates:         <deadlines, start windows>
Budget signal: <anything said about money>
Gaps:          <what is missing and would change the price>
```

The Gaps line is the one that protects the owner. Everything else describes the job; that line describes what could go wrong.

---

## Call and meeting transcripts

The richest input. Read the whole thing — the useful details are usually in the middle, not the summary.

**Zoom's limits, so a missing transcript is not mistaken for an empty call.** It is read-only.
It only reaches meetings the owner hosted or attended. And a recordings list covers a
one-month range per call, so history older than that needs a second, earlier request. When a
meeting is not reachable, say which one and ask the owner for the recording or their notes —
never build a proposal on a call you could not read.

Look for:

- **Direct quotes about what they want.** Use their words in the proposal. Customers recognize their own phrasing and it signals they were heard.
- **Constraints mentioned in passing.** "We can only get in after 6" is a cost driver that never appears in a scope list.
- **Who actually decides.** "I'll need to run it by the board" changes the timeline and the follow-up.
- **Budget signals.** "Last time we paid around 8" is the most valuable sentence in the transcript.
- **What they complained about with their last vendor.** That is what the proposal should quietly address.

---

## Voice memos

Recorded in a truck, often mid-thought, often with detail nobody would write down.

Treat interruptions and self-corrections as real. If the owner says "call it four units — no, five, there's one on the back roof," the answer is five, and the fact they nearly missed it means the back roof deserves a note.

If audio is unclear on a number, do not guess it. Flag it: "couldn't make out the tonnage at 0:47 — confirm before this goes out."

---

## Photos

Photos are excellent for some things and worthless for others. Being honest about which is what keeps the owner out of trouble.

**Photos can establish:** equipment make and model from a nameplate, visible condition and age, access constraints, obvious obstructions, approximate layout, what is already installed.

**Photos cannot establish:** dimensions without a reference object, what is behind or above anything, condition of concealed components, code compliance, or capacity.

Never derive a quantity from a photo unless something of known size is in frame. Estimated square footage from a photo is the single most common way a job goes underwater.

State what each photo contributed and what it left open:

```
Photo 3 shows a Carrier 48TC rooftop unit, nameplate legible, visible rust at
the base pan. Age not determinable from the plate. Roof access appears to be
ladder-only — confirm, because a crane changes the number materially.
```

---

## Drawings and plan sheets

Read the title block first: revision, date, scale, and whether it is issued for construction or preliminary. A quote against a superseded revision is a quote against the wrong job.

Take quantities from schedules and legends, not by measuring the drawing. If a schedule is absent and quantities must be counted, say so and state the count as an assumption.

Note anything marked "by others" or "NIC" — that is scope boundary and it belongs in the not-included section verbatim.

---

## RFPs, RFQs, and solicitations

These are compliance documents before they are pricing documents. A perfect price on a non-compliant response loses.

Extract in this order:

1. **Submission mechanics** — deadline, format, page limits, delivery method. Miss any of these and nothing else matters.
2. **Mandatory qualifications** — licenses, bonding, insurance limits, certifications, past-performance minimums
3. **The actual scope of work**
4. **Evaluation criteria and their weights** — this tells you what the response should emphasize
5. **Terms that carry cost** — liquidated damages, retainage, payment timing, warranty length, prevailing wage

**Run a go/no-go before writing anything.** If the owner cannot meet a mandatory qualification, say so immediately. Writing a full response to an RFP they are disqualified from is a wasted evening, and this segment does not have spare evenings.

```
Go/no-go: This requires a USD 2M umbrella policy and you carry USD 1M. That's
disqualifying unless you can bind additional coverage before the 8th.
Worth checking before I write the rest?
```

---

## Scrappy notes

Sometimes it is four lines typed on a phone. That is enough to start, and it is better than the owner writing the proposal from scratch.

Extract what is there, then list what is missing as direct questions — the smallest set that would let the price be real:

```
Enough here to draft the shape of it. Three things I need before the number
means anything:
  - Square footage of the space
  - Is the existing ductwork staying?
  - Any deadline you know about?
```

Three questions, not a form. The owner is answering this on a phone.

---

## Handling the gaps

Every gap resolves one of two ways, and never a third:

**Ask,** when the answer materially changes the price and the owner can get it quickly.

**Assume, in writing,** when the job needs to move. The assumption goes in the proposal itself, in the customer-visible text:

```
This quote assumes roof access by existing ladder. If a crane or lift is
required, add USD 1,800.
```

That sentence has saved more margin than any pricing refinement. It converts a dispute into a pre-agreed line item.

**Never guess silently.** A number with an invisible assumption behind it is the mechanism by which a profitable job becomes a loss.