# Roadmap: kubeasy-cli

## Milestones

- ✅ **v1.0 Réduction de la dette technique** — Phases 1–5 (shipped 2026-03-11)
- ✅ **v2.7.0 Connectivity Extension** — Phases 6–9 (shipped 2026-03-11)

## Phases

<details>
<summary>✅ v1.0 Réduction de la dette technique (Phases 1–5) — SHIPPED 2026-03-11</summary>

- [x] Phase 1: Safety Hardening (3/3 plans) — completed 2026-03-09
- [x] Phase 2: Command Test Coverage (3/3 plans) — completed 2026-03-09
- [x] Phase 3: Error Handling (3/3 plans) — completed 2026-03-09
- [x] Phase 4: Code Quality (3/3 plans) — completed 2026-03-10
- [x] Phase 5: Security Hardening (2/2 plans) — completed 2026-03-10

Full details: `.planning/milestones/v1.0-ROADMAP.md`

</details>

<details>
<summary>✅ v2.7.0 Connectivity Extension (Phases 6–9) — SHIPPED 2026-03-11</summary>

- [x] Phase 6: Infrastructure Foundation (4/4 plans) — completed 2026-03-11
- [x] Phase 7: Probe Pod + Internal Connectivity (2/2 plans) — completed 2026-03-11
- [x] Phase 8: External HTTP (2/2 plans) — completed 2026-03-11
- [x] Phase 9: TLS Validation (2/2 plans) — completed 2026-03-11

Full details: `.planning/milestones/v2.7.0-ROADMAP.md`

</details>

## Progress

| Phase | Milestone | Plans Complete | Status | Completed |
|-------|-----------|----------------|--------|-----------|
| 1. Safety Hardening | v1.0 | 3/3 | Complete | 2026-03-09 |
| 2. Command Test Coverage | v1.0 | 3/3 | Complete | 2026-03-09 |
| 3. Error Handling | v1.0 | 3/3 | Complete | 2026-03-09 |
| 4. Code Quality | v1.0 | 3/3 | Complete | 2026-03-10 |
| 5. Security Hardening | v1.0 | 2/2 | Complete | 2026-03-10 |
| 6. Infrastructure Foundation | v2.7.0 | 4/4 | Complete | 2026-03-11 |
| 7. Probe Pod + Internal Connectivity | v2.7.0 | 2/2 | Complete | 2026-03-11 |
| 8. External HTTP | v2.7.0 | 2/2 | Complete | 2026-03-11 |
| 9. TLS Validation | v2.7.0 | 2/2 | Complete | 2026-03-11 |