# Phase 02: Integration

Canonical Beads issue: `example-2`

## Outcome

The verified slice is integrated and operationally observable.

## Scope

Allowed:

- integration wiring for the verified slice
- focused operational evidence

Out of scope:

- unrelated production hardening and new product behavior

## Dependencies

- `example-1`

## Acceptance Evidence

- Integration gates pass.
- Failure behavior is observable and documented.
- Review and CI reach terminal states.

## Execution Boundary

- Acceptance boundary: integrate the verified slice with observable failure behavior
- Module surface: integration wiring, operational report, and focused test fixtures
- Review boundary: integration and observability diff plus integration tests

## Quality Gates

- integration tests
- independent diff review

## Replanning Triggers

- integration requires changing the accepted public interface
