# Plan

## Objective

{What you're building, why, and expected outcome in 2-5 sentences.}

## Scope

**In Scope:**
- {Specific deliverable 1}
- {Specific deliverable 2}

**Out of Scope:**
- {Explicitly excluded item}

---

## Phase 1: {Phase Name}

### Steps
- [ ] 1.1 {Concrete action starting with verb}
- [ ] 1.2 {Concrete action starting with verb}
- [ ] 1.3 {Concrete action starting with verb}

### Gates
- [ ] {Testable criterion with command or check}
- [ ] {Testable criterion with command or check}

---

## Current Phase: 1
## Status: not-started

---

## Success Criteria

Overall verification that the objective is achieved:

- [ ] {Final testable criterion 1}
- [ ] {Final testable criterion 2}
- [ ] {Final testable criterion 3}
